Installation & Start-up – HES Series
19
CONDENSER EQUIVALENT
LINE SIZE WORKSHEET
Discharge Gas Line O.D. _____________
Fitting Type
Number Used
Factor
Total
Globe Valve (open)
Angle Valve (open)
45
°
Elbow
90
°
Elbow
Feet of Straight Copper Used
Total Fitting Factor
Total Equivalent Feet
Fitting Factors
Copper Tube O.D. Type “L”
1/2”
5/8”
7/8”
1 1/8”
Globe Valve (open)
14
16
22
28
Angle Valve (open)
7
9
12
15
45
°
Elbow
.5
1
1
1.5
90° Elbow
1
2
2
3
TABLE - 5
FIGURE - 10
Minimum Traps for Discharge Lines
Содержание HE S Series
Страница 1: ...5 2 2011 HE S Series TUBE ICE MACHINE INSTALLATION START UP INSTRUCTIONS Part Number 12A4171S0702 ...
Страница 2: ...Installation Start up HES Series 2 Blank Page ...
Страница 12: ...Installation Start up HES Series 12 FIGURE 8 Typical Space Diagram ...
Страница 26: ...Installation Start up HES Series 26 FIGURE 16 Piping Schematic Air Cooled ...
Страница 27: ...Installation Start up HES Series 27 FIGURE 17 Piping Schematic Water Cooled ...
Страница 41: ...Installation Start up HES Series 41 Casing Installation FIGURE 28 Stainless Casing Installation ...