30
2 INSTALLATION
Installation should be performed only by expert
personnel authorised by the manufacturer.
During installation, ensure that the power source
is disconnected from the mains.
The multiple connection of power sources (series
or parallel) is prohibited.
2.1 Lifting, transport & unloading
- The equipment is provided with a handle for hand transportation.
- Use a fork lift truck paying attention during operations in
order to prevent the generator from tipping over.
Do not underestimate the weight of the equip-
ment: see technical specifications.
Do not move or position the suspended load
above persons or things.
Do not drop or apply undue pressure on the
equipment.
2.2 Positioning of the equipment
Keep to the following rules:
- Provide easy access to the equipment controls and connec-
tions.
- Do not position the equipment in very small spaces.
- Do not place the equipment on surfaces with inclination
exceeding 10° from to the horizontal plane.
- Position the equipment in a dry, clean and suitably ventilated
place.
- Protect the equipment against pouring rain and sun.
2.3 Connection
The equipment is provided with a power supply cable for con-
nection to the mains.
The system can be powered by:
- single-phase 115V
- single-phase 230V
CAUTION: to prevent injury to persons or damage
to the equipment, the selected mains voltage and
fuses must be checked BEFORE connecting the
machine to the mains. Also check that the cable is
connected to a socket provided with earth contact.
Operation of the equipment is guaranteed for volt-
age tolerances up to ±15% with respect to the
rated value.
In order to protect users, the equipment must be
correctly earthed. The power supply voltage is pro-
vided with an earth lead (yellow - green), which
must be connected to a plug provided with earth
contact.
The electrical connections must be made by
skilled technicians with the specific professional
and technical qualifications and in compliance
with the regulations in force in the country where
the equipment is installed.
The power source supply cable is provided with a yellow/
green wire that must ALWAYS be earthed. This yellow/green
wire shall NEVER be used with other voltage conductors.
Verify the existence of the earthing in the equipment used
and the good condition of the sockets.
Install only certified plugs according to the safety regula-
tions.
2.4 Installation
Connection for MMA welding
The connection shown in the figure produces
reverse polarity welding. To obtain straight polar-
ity welding, reserve the connection.
- Connect (1) the earth clamp to the negative socket (-) (2) of
the power source.
- Connect (3) the electrode holder to thpositive socket (+) (4)
of the power source.
Содержание bohler welding URANOS 1700 AC/DC
Страница 70: ...70...
Страница 94: ...94...
Страница 182: ...182...
Страница 251: ...1 1 1 10 C 40 C 14 F 104 F 25 C 55 C 13 F 131 F 50 40 C 40 00 C 90 20 C 68 F 2000 6500 1 2 10 251...
Страница 252: ...252 1 3 1 4 11 35 1 5 1 6...
Страница 253: ...253 8 1 7 EN IEC 60974 10 B A A EN60974 10 A pace maker Zmax Ssc Point of Commom Coupling PCC...
Страница 254: ...1 8 IP S IP23S 12 5 mm 60 2 2 1 2 2 10 2 3 115V 230V 15 254...
Страница 256: ...256 7 8 9 64 3 3 1 LCD 1a 1b 2 2a encoder encoder 2b 2c 2d 3 3a VRD Voltage Reduction Device 3b MMA TIG DC TIG AC 3c...
Страница 261: ...261 encoder encoder 1 2 3 2 1 3 1 encoder 4 1 encoder 1 2 1 2...
Страница 266: ...266 4 5 RC 200 RC 200 4 6 ST 4 7 ST U D U D TIG Set up 4 8 ST DIGITIG 4 8 1 DIGITIG TIG 3 4 Set up 5 6...
Страница 267: ...267 Reset encoder...
Страница 268: ...268 7 7 1 MMA...
Страница 272: ...272...
Страница 276: ...276 URANOS 2200 AC DC...
Страница 280: ...280...
Страница 281: ......
Страница 282: ...voestalpine B hler Welding www voestalpine com welding...