DM16-01.01.22en Mission
Inverter
Service manual
35
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of
the cylinder. If the refrigerant is R410A, make the cylinder bottom up to ensure liquid charge.
2). Purge the air from the charge hose
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4). Open the valves (Low side) on the charge set and charge the system with liquid refrigerant
If the system cannot be charge with the specified amount of refrigerant, or can be charged with a little at
a time (approximately 150g each time) , operating the air conditioner in the cooling cycle; however, one
time is not sufficient, wait approximately 1 minute and then repeat the procedure.
5).When the electronic scale displays the proper weight, disconnect the charge hose from the 3-way
valve’s service port immediately
If the system has been charged with liquid refrigerant while operating the air conditioner, turn off the air
conditioner before disconnecting the hose.
6). Mounted the valve stem caps and the service port. Use torque wrench to tighten the service port cap
to a torque of 18N.m.
Be sure to check for gas leakage
Содержание Mission Inverter Series
Страница 12: ...Mission Inverter DM16 01 01 22en 12 Service manual For MSMBAU 09HRFN1 BW For MSMBBU 12HRFN1 BW ...
Страница 13: ...DM16 01 01 22en Mission Inverter Service manual 13 For MSMBCU 18HRFN1 BW For MSMBDU 24HRFN1 BW ...
Страница 17: ...DM16 01 01 22en Mission Inverter Service manual 17 For MOCA01 24HFN1 ...
Страница 24: ...Mission Inverter DM16 01 01 22en 24 Service manual MOBA02 09HFN1 MOB03 12HFN1 ...
Страница 25: ...DM16 01 01 22en Mission Inverter Service manual 25 MOB02 18HFN1 MOCA01 24HFN1 ...