
17
6.3 Pipe length and the elevation
The pipe length and refrigerant amount:
Model
Pipe size
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Length
A (m)
Additional
refrigerant
(g/m)
Gas
Liquid
3/8’’
(Ф9.52)
1/4’’
(Ф6.35)
5
8
20
20
5
8
20
20
1/2
’’
(Ф
12.7)
1/4’’
(Ф6.35)
5
10
25
20
5
/8’’
(Ф15.9)
3/8’’
(Ф9.52)
5
10
25
40
Caution:
The capacity test is based on the standard length and the maximum permissive length is based on the
system reliability.
The oil trap should be installed per 5-7 meters.
ACP-09CH25AELI
ACP-12CH35AELI
ACP-18CH50AELI
ACP-22CH65AELI
Содержание ACP-09CH25AELI
Страница 1: ...ACP 09CH25AELI ACP 12CH35AELI ACP 18CH50AELI ACP 22CH65AELI Service manual ENG RoHS ...
Страница 2: ......
Страница 13: ...12 5 Wiring Diagram 5 1 Indoor Unit ACP 09CH25AELI ACP 12CH35AELI ACP 18CH50AELI ...
Страница 14: ...13 ACP 22CH65AELI ...
Страница 15: ...14 5 2 Outdoor Unit ACP 09CH25AELI ACP 12CH35AELI ACP 18CH50AELI ...
Страница 16: ...15 ACP 22CH65AELI ...
Страница 27: ...26 Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage ...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......