![VITRA Xero Frame L Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/vitra/xero-frame-l/xero-frame-l_assembly-and-operating-instructions-manual_1037475007.webp)
A
SW2.5
8x
7
Xero Frame P/L
v
1/2018 (EN)
1/2018 (EN)
EN
3.4 assembling frame
NOTICE! The onesided electrified frame (wall
frame) is not electrified on the back (A).
3 Assembly
⚠
WARNING
The system can fail if assembly is not carried out
correctly or the base cannot support the necessary
load. There is a danger of injury from goods or mer-
chandise supports falling down.
>
Note and comply with all the following instruc-
tions on assembly.
>
make sure that the fixings and base can support
a pulling force of 6 kN per fixing point.
3.1 Unpacking
Immediately on receipt, check the delivery is complete
and intact.
If transport damage is noted, proceed as follows:
• Do not accept delivery or only under reservation.
• Make a note of the extent of the damage on the trans
port documents or the delivery note of the transport
company.
• Initiate a complaint.
Packaging
The product is securely packed so that transport damage
is unlikely.
• Store original packaging for subsequent transport.
• Only send product in original packaging.
• Take note of all instructions which are given on the
packaging.
Disposing of packaging materials
If the packaging materials are no longer required,
dispose of them according to local disposal regulations.
3.2 Storage
Store the product and its components under the
following conditions:
• Do not store outdoors.
• Store in a dry and dustfree place.
• Do not expose to any aggressive media.
• Protect from direct sunlight.
• Avoid mechanical shocks.
• Storage temperature: 23 °C
• Relative humidity: 50%
3.3 requirements of installation location
The installation location must comply with the following
requirements:
• The installation location must be dry. Construction
outdoors is not permitted.
• The walls must be designed for, and able to support,
the load to be borne (check with architect and structu
ral engineer).