11
Installation Instructions (continued):
Figure 11.
Figure 12.
1. Connect the Ball Valve to the water Storage Tank thread on the upper side of the tank.
Make sure the black rubber gasket sits flat. Tighten the valve but do not overtighten.
2. Connect the
¼
” yellow tubing to the ball valve. Push the tubing in all the way to
make sure it is properly seated.
3. Turn the ball valve off.
Remove
Protective
Cap
1/4” Yellow
Tubing
Rubber Gasket
Open
Closed
Storage
Tank
Storage
Tank
Ball Valve
CAUTION: Before cutting the supplied tubing measure the distance between the components.
All tubing is colour-coded for ease of installation.
¼” Black - Connects the waste water from the RO membrane to the Air Gap faucet intake line.
¼” Red - Connects the inlet valve of the cold water supply to the inlet of the system.
¼” Yellow - Connects the RO membrane to the storage tank.
¼” Blue - Connects the outlet of the system to the faucet.
3/8
” Black - Connects the faucet to the drain saddle clamp.
Note: Reference the diagram on page 3, 4 or 5 for colour and connection point on the RO System.
Each connection point has coloured plugs to match the colour of the tubing that connects
at that point. The plugs must be removed before installing the tubing.
Quick connect fittings are used throughout the system. To insure an optimal seal, tubing
should be cut with the end square. An angled cut or distortion of the tubing will not
provide a proper seal and may cause leaks.
To remove the plugs and install the tubing, please see “Tubing Connection with Push-in Fittings”.
Mounting the Ball Valve Onto the Storage Tank (See figure 11 and 12):
Connecting the Tubes