Figure 21: Corner Installation.
Installation
M
OBILE
H
OME
I
NSTALLATION
- F
REESTANDING
:
2" (5 cm)
2"
(5 cm)
6"
(15 cm)
Floor Protection
Fresh Air Intake
Wall thimble
manufactured
by pellet vent
manufacturer.
VF100
1
/
4
” LAG BOLTS
SECURELY FASTENED
GROUND WIRE DIRECTLY
TO METAL CHASSIS
HEARTH PAD
FLOORING
STEEL FRAME
● Secure the heater to the floor using the
two holes in the pedestal.
● Ensure the unit is electrically grounded to
the chassis of your home (permanently).
● Do not install in a room people sleep in.
● Outside fresh air is mandatory. Secure
outside air connections directly to fresh
air intake pipe and secure with three (3)
screws evenly spaced.
CAUTION: THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL
AND CEILING/ROOF MUST BE MAINTAINED.
C
ORNER
T
HROUGH
W
ALL
I
NSTALLATION
- F
REESTANDING
:
Figure 20: Mobile home installation.
18
Содержание VF 100A
Страница 35: ...35 Parts Diagram Components...
Страница 36: ...Parts Diagram Steel 36...