Vista Leisure - 11 x 11 Open Air
Step Seventeen
MILANO
CAREFULLY PEEL PROTECTIVE COATING OFF BOTH SIDES
OF THE ACRYLIC PANEL
ALIGN THE CENTRE PRE-DRILLED HOLES OF THE ACRYLIC
WITH THE PRE-DRILLED HOLES OF THE SKYLIGHT FRAME.
ONCE THE ACRYLIC IS IN PLACE SCREW THROUGH THE
PRE-DRILLED HOLES USING 1 1/2" ROOF SCREWS WITH
POLYZIP WASHERS AS SHOWN.
DC: 1842
1 1/2" ROOFING SCREWS WITH POLYZIP
WASHERS
2 req
IT IS IMPORTANT THAT THE SCREWS ARE CENTRED IN
ACRYLIC HOLES. THIS IS TO PREVENT CRACKING OF THE
ACRYLIC CAUSED BY EXPANSION AND CONTRACTION
0093_Milano_11x11_Instructions_V1.2
TOLL FREE: 1-877-795-7423
J
EN