Vista Leisure - 11 x 11 Open Air
Step Fourteen
MILANO
FRONT VIEW
SECTION VIEW
DC-1853
DC-1855
DC-1856
DC-1854
PLACE THE FOUR METAL ROOFING SHEETS ON THE ROOF STRAPS AS SHOWN.
LAY THE PIECES OUT EVENLY. PLACE THE TWO CENTRE SHEETS TIGHT TO
THE SKYLIGHT BOX.
MAKE SURE YOU HAVE ALL FOUR PIECES IN PLACE WITH AND EQUAL
OVERHANG OVER THE THE WHOLE EDGE OF THE EAVE (BOTTOM STRAPPING
PIECE). ATTACH THE METAL ROOF SHEETS TO THE STRAPPING WITH 1" HEX
HEAD ROOFING SCREWS.
PLACE A SCREW THROUGH EACH THE PRE-DRILLED HOLES IN THE ROOFING
SHEETS.
DO THIS STEP ON THREE SIDES OF THE ROOF.
1" ROOF SCREWS
120 req
PLACE THE METAL SHEETS
TIGHT TO THE OUTSIDE
EDGE OF SKYLIGHT
FRAME.
NOT ON TOP OF
THE FRAME.
TIP:
PLACE THE ROOFING ON
ONLY THREE SIDES OF THE ROOF
THEN MOVE ON TO THE NEXT STEP.
THIS WILL MAKE IT EASIER TO PLACE
THE SKYLIGHT BY NOT HAVING TO GO
ON THE ROOF.
NOTE:
FASTEN ALL ROOFING SCREWS PRIOR
TO STEPPING ON ROOF.
0093_Milano_11x11_Instructions_V1.2
TOLL FREE: 1-877-795-7423
I
EN