SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com
18
9.
Verify that the
indicator illuminates solid, indicating that the UPS is
operating normally and any loads are powered.
10.
If optional EBPs are installed, see “Configuring Battery settings” on page 28
to set the number of installed EBPs.
11.
To change any other factory-set defaults, see “User settings” on page 25.
NOTE
:
At initial startup, the UPS sets system frequency according to input line
frequency (input frequency auto-sensing is enabled by default).
NOTE
:
At initial startup,please set the output voltage needed before start up the
UPS,After the subsequent startup,the UPS will output the setting voltage.
12.
If you installed an optional EPO, test the EPO function: Activate the external
EPO switch. Verify the status change on the UPS display. Deactivate the
external EPO switch and restart the UPS.
NOTE
:
The internal batteries charge to 80% capacity in less than 5 hours. However,
we recommend that the batteries should be charged for 48 hours after installation
or long-term storage. If optional EBPs are installed, see the recharge times listed in
Table 21 on page 48.
4
Operation
This chapter contains information on how to use the UPS, including front cover operation, operating
modes, UPS startup and shutdown, transferring the UPS between modes, and configuring bypass
settings, load segments, and battery settings.
Control Cover Functions
The UPS has a three-button segmental LCD with backlight. It provides useful information about the
UPS itself, load status, measurements, and settings (see FIG. 18).
FIG.18
Control Cover