![Vision & Control 4-21-185 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/vision-and-control/4-21-185/4-21-185_instructions-for-use-manual_1031466034.webp)
vicosys
®
6300
Commissioning
6.3.7 Connect the supply voltage and start the device
NOTICE
Destruction caused by potential differences.
•
Ensure that the device is properly grounded (equipotential bonding).
Connect the supply voltage
The voltage is supplied via the 4-pin operating voltage connector (scope of delivery) on the
device.
TX1
RX1
TX2
RX2
2
1
5
6
8
7
1
4
2
1
2
1
Image 19: Operating voltage supply
(1)
Grounding screw with washer (housing ground)
(2)
4-pin operating voltage connector
1. Ensure that the supply voltage is switched off.
2. Connect the positive voltage (plus) to +V
DC
and the negative voltage (ground) to GND.
3. Connect the housing ground.
4. Plug the operating voltage connector to the device and tighten the screws.
Pin
Signal
Description
1
GND
Ground
2
+ V
DC
Supply voltage
3
+ V
DC
Supply voltage
2
1
4
3
4
GND
Ground
Gerät einschalten
5. Switch on the supply voltage.
The device boots automatically.
ADVICE
Before switching on the unit, connect a monitor to one of the monitor interfaces. You
can observe the booting process.
34
999.995.428.10-en-2.1
© Vision & Control GmbH 2022