Vingtor 2210020000 Скачать руководство пользователя страница 9

 9

IP DECT Deployment on Ships

A100K10676

General Layout of a Ship

In deploying the IP DECT system, guidelines should be followed for the 

three separate areas on the ship: 

accommodations and bridge

 

below main deck 

 

outdoor areas

 

The main components of the IP DECT system on the vessel are:  

Server 6000

 -

Base stations

 -

Leaky antenna cable

 -

Accommodations and Bridge 

4.1 

This area comprises the cabins, mess, wardrobe, and bridge above the 

main deck and covers several decks. In our example, the area includes 

the Bridge Deck, and the Third, Second, and First Decks.

Below Main Deck 

4.2 

This area comprises the engine room, engine control room, pump rooms, 

switchboard room, and storage rooms and covers several decks. In our 

example, Below Main Deck comprises the Tween Deck and Tank Top 

Deck.

Outdoor Areas

4.3 

This area comprises the main open area of the Main Deck, the “terrace 

corridor” one deck above (e.g. First Deck) the outer edges of the Main 

Deck, the work areas at the outer edges of the Main Deck, and the 

hangar.  

Base Stations

4.4 

The base station is usually mounted on the wall using the accompanying 

anchors and screws. The base station has two built-in diversity antennas 

and is directional. Depending on the materials and construction of the 

vessel, the maximum coverage area for the base station is approximately 

50 meters indoors and approximately 150 meters outdoors.
It can be deployed in accommodation and outdoor areas, as well as 

below main deck in rooms with many installations – like the pump and 

engine rooms.   

Recommended placement of base stations

4.4.1 

In optimal conditions, there should be no more than 20 x 20 meters 

 

between base stations.
There should be at least 1 base station for each deck, one fore and 

 

one aft 

depending on deck and vessel size, there should also be one 

 -

reserve PoE point for the potential deployment of base stations

For each deck, there should be one base station on the port side and 

 

one diagonally opposite on the starboard side.

Содержание 2210020000

Страница 1: ...IP DECT Deployment on Ships A100K10676 DEPLOYMENT GUIDE IP DECT 6000 System...

Страница 2: ...sing from the information in it No information in this publication should be regarded as a warranty made by Zenitel Norway AS The information in this publication may be revised or changed without noti...

Страница 3: ...line for Below Main Deck 19 7 1 Engine Room Deployment Tween Deck 19 7 2 Pump and Storage Rooms Deployment 19 8 Deployment Guideline for Outdoor Areas 21 8 1 Hangar Deployment 21 8 2 Main Deck Deploym...

Страница 4: ...Before You Begin 1 1 This document assumes the following You have a working knowledge of AlphaCom ACM exchange operations and that the exchange is installed and initialized and is working properly You...

Страница 5: ...ive Computer IP DECT 6000 System Configuration Figure 1 Base Station Repeater DECT Handset Rough DECT Handset Office DECT Handset Rough DECT Handset Rough Bluetooth DECT Handset Office DECT Handset Ro...

Страница 6: ...ds 25 dB it is not certain that synchronization will be stable For example the signal measured next to the base station is 100 dB The handset with test display active is moved away from the base stati...

Страница 7: ...orking then all base stations behind are also not working Figure 3 Synchronization Chain Layout without Secondary Sync Ways No 0 is the Sync Master can be numbered 0 to 255 Green line Shows the primar...

Страница 8: ...ondary sync on No 21 In the example above base station No 10 is down Consequently base station No 11 must use the secondary sync way on base station No 21 Figure 6 Sync Chain showing Primary Secondary...

Страница 9: ...eck above e g First Deck the outer edges of the Main Deck the work areas at the outer edges of the Main Deck and the hangar Base Stations 4 4 The base station is usually mounted on the wall using the...

Страница 10: ...s no handover is needed when moving between rooms sections as the cable goes straight through the wall air sync can be taken in from a base station at the end of the leaky cable the end of the leaky c...

Страница 11: ...tations from the decks above and below the Main Deck have primary sync ways that lead to the Sync Master on that deck The main consideration here is to implement a synchronization chain that remains i...

Страница 12: ...oyment on Ships Overview of Primary and Secondary Sync Ways for all Decks Figure 7 BRIDGE DECK 6 5 4 3 13 1 2 12 11 14 15 Primary Sync Secondary Sync THIRD DECK SECOND DECK FIRST DECK MAIN DECK TWEEN...

Страница 13: ...e station needs to be installed Third Deck 5 4 Base station 5 on the Third Deck has a primary sync with base station 4 on the Second Deck If this primary sync fails then its secondary sync with base s...

Страница 14: ...ed First Deck 5 6 Base station 3 on the First Deck has a primary sync with Sync Master 1 on the Main Deck If this primary sync fails then its secondary sync with base station 15 on the Main Deck will...

Страница 15: ...ster 1 on the Main Deck If this primary sync fails then its secondary sync with base station 2 on the Main Deck will take over the synchronization Base station 12 has a primary sync with Sync Master 1...

Страница 16: ...ase station 11 on the Tween Deck If this primary sync fails then its secondary sync with base station 14 will take over the synchronization There are two reserve PoE points placed at strategic locatio...

Страница 17: ...base station normally one base station on each deck should provide sufficient coverage but one PoE point should also be installed on the far side of the base station in case of coverage holes Example...

Страница 18: ...th on the deck above or below Hence the sync way goes from deck to deck in a zig zag fashion This deployment configuration will provide the maximum air coverage and eliminate any potential coverage ho...

Страница 19: ...m the closest base station on the Main Deck above Base station and leaky cables in Engine Room Front Figure 9 Azimuth areas on Tween Deck Pump and Storage Rooms Deployment 7 2 These areas include the...

Страница 20: ...n Deck air sync for the narrow corridor between the storage tank area at the fore and aft of the ship is covered by using leaky cables base stations 11 and 12 There are two reserve PoE points installe...

Страница 21: ...in Hangar on Main Deck Figure 12 The Hangar can best be covered by using one standard base station in this deployment example it is also the Sync Master base station 1 Main Deck Deployment 8 2 The Mai...

Страница 22: ...m the elements The standard base station is directed out and down towards the open Main Deck area Base station deployment on Main Deck Figure 14 In the example above base stations 2 and 13 should be a...

Страница 23: ...23 IP DECT Deployment on Ships A100K10676...

Страница 24: ...pany s Quality Assurance System is certified to meet the requirements in NS EN ISO 9001 2008 Zenitel Norway AS reserves the right to modify designs and alter specifications without prior notice in pur...

Отзывы: