INSTALLATION INSTRUCTIONS
Hydrosense Conventional Water Detection System
Document Part No. 3500012 REV03
Page | 1 of 27
Overview of the Hydrosense Water Detection System .............................................. 2
Detection Components ......................................................................................................... 3
Linear Detection- Hydrowire Cable ......................................................................................................... 3
Linear Detection EOL ..................................................................................................................................... 3
Linear Detection Connection Interface ................................................................................................... 3
Floor Probe Junction Box .............................................................................................................................. 3
Point Detection Floor Probe ........................................................................................................................ 4
Control and Indicating Equipment of a Hydrosense System ................................... 4
Control Panel (2 to 8 Zones) ....................................................................................................................... 4
Hydrosense Mimic Panels ............................................................................................................................ 4
System components: ....................................................................................................................................... 5
System Options ................................................................................................................................................. 5
Design & Planning .................................................................................................................. 5
Design Notes ...................................................................................................................................................... 5
Design Guidelines ............................................................................................................................................ 6
Hydrosense Floor Probe: .............................................................................................................................. 6
Hydrowire Cable: ............................................................................................................................................. 6
System Installation Notes ............................................................................................................................. 6
Panel Installation ................................................................................................................... 7
Safety ..................................................................................................................................................................... 7
Panel Mounting ................................................................................................................................................. 7
Removing the front facia ............................................................................................................................... 8
Control relays ................................................................................................................................................. 12
Access level 2 configuration options .................................................................................................... 13
Access level 3 configuration options .................................................................................................... 14
Internal Switches .......................................................................................................................................... 16
Watchdog Reset switch (W/Dog Reset) .............................................................................................. 16
Processor Reset ............................................................................................................................................. 16
Internal Indicators ........................................................................................................................................ 17
Hydrowire Installation and Commissioning ............................................................... 18
Hydrowire Installation HSHWI-100 ..................................................................................................... 18
Hydrowire Wiring ................................................................................................................ 19
Hydrowire Remote Lamp Connection ................................................................................................. 19
Hydrowire Commissioning – HSHWC-100 ........................................................................................ 20
Hydrowire Layout ......................................................................................................................................... 21
Floor Probes Installation and Commissioning ........................................................... 22
Floor Probe Installation HSFPI -100 ..................................................................................................... 22
Floor Probe Wiring ....................................................................................................................................... 23
Floor Probe Remote Lamp Connection ............................................................................................... 23
Floor Probe Testing ..................................................................................................................................... 24
Probe Layout ................................................................................................................................................... 25
Hydrosense Commissioning Record .............................................................................. 26