18
Performance Checklist
□
Plug-in refrigerator and verify operation.
□
Connect water supply (if applicable).
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
□
Align/square door(s).
□
Verify drain pan properly installed and no leaks
on water connection.
□
Remove internal packaging and labels and
wipe refrigerator down.
Installer’s information:
Installer’s name:_____________________________
Installer’s company:____________ ______________
Date:_______________________________________