background image

21

Performance Checklist

A qualified installer should carry out the
following checks:

h

Check top surface elements—glow red
when turned on.

h

Check hot surface indicator lights—glow
red when corresponding element is on.

h

Check oven bake function—bake element
on full power, center and outside broil
elements at partial power. 

h

Convection bake function—bake and broil
elements the same with the convection fan
on.

h

Check TruConvec™ function—TruConvec
element (behind convection fan cover) on
and convection fan on.

h

Check HI broil function–both broil
elements at full power.

h

Check LOW broil function—inner broil
element only. 

h

Check convection broil function—both
broil elements at full power with convection
fan on.

h

Check self-clean function—door will lock 
in approximately 30 seconds, the center
and outside broil elements will turn on and
the bake element will turn on at partial
power. Check broil elements through
window to make sure they are on, then
abort self-clean cycle to unlock door.

Final Preparation

• All stainless steel body parts should be

wiped with hot, soapy water and with a
liquid cleaner designed for this material. 
If buildup occurs, 

DO NOT

use steel wool,

abrasive cloths, cleansers, or powders!
If it is necessary to scrape stainless steel

to remove encrusted materials, soak with
hot, wet cloths to loosen the material, then
use a wool or nylon scraper. 

DO NOT

use

a metal knife, spatula, or any other
material tool to scrape stainless steel!
Scratches are almost impossible to
remove.

NOTICE

When conducting performance test, 

DO NOT

run self-clean cycle for more

than 10 minutes with oven racks inside

oven. This could cause them to discolor

due to the high temperature required 

for self-cleaning.

20

1

1

2

2

3

2

Reattach door to range.

Open door completely. Reattach hinge trim.

3

4

Remove pins from hole in hinges.

Close door.

5

If the door needs to be adjusted, loosen hinge trim screws (see step 2).

Adjust the screws located between the door and kickplate using a 5/32”

hex head allen wrench. After adjustment, tighten hinge trim screws.

Door Replacement and Adjustment

Содержание F20508

Страница 1: ...eet Greenwood Mississippi 38930 USA 662 455 1200 For product information call 1 888 VIKING1 845 4641 or visit the Viking Web site at vikingrange com F20508C EN 112508J Viking Installation Guide Profes...

Страница 2: ...ances must be observed Installation must conform with local codes Your safety and the safety of others is very important We have provided many important safety messages in this manual and on your appl...

Страница 3: ...0 watts 1 800 watts 800 watts 1 800 watts Oven interior width 25 5 16 64 6 cm Oven interior height 16 1 2 41 9 cm Oven interior depth AHAM 16 13 16 42 7 cm Overall 19 1 2 49 5 cm Oven volume Total ove...

Страница 4: ...the cooking surface The bottom of a standard hood should be 30 76 2 cm min to 36 91 4 cm max above the countertop This would typically result in the bottom of the hood being 66 167 6 cm to 72 182 9 c...

Страница 5: ...ap which must be peeled off The interior should be washed thoroughly with hot soapy water to remove film residues and any dust or debris before being used then rinsed and wiped dry Solutions stronger...

Страница 6: ...Leg Installation 10 WARNING DANGER CAUTION FOR YOUR SAFETY To avoid risk of personal injury or product damages DO NOT use the handle or oven door to lift the oven Remove door before installation to en...

Страница 7: ...ion is made at the terminal block which is located behind the access door on the back of the range 3 2 1 2 Remove supply cord strain relief bracket and three supply cord mounting screws on terminal bl...

Страница 8: ...unit may or may not be permitted through your local codes If ground to the frame is not permitted then a 4 conductor power cord must be used WARNING Electrical shock hazard To avoid risk of electrica...

Страница 9: ...el For uneven or sloped floors level unit with metal shims only as the adjustment required may exceed the thread available in the leg 3 3 8 3 8 0 95 cm 0 95 cm 3 8 0 95 cm 4 Move unit into opening Lev...

Страница 10: ...ignment section 18 1 Note Refer to range electrical requirements section for proper installation information 1 2 4 Attach bracket with mounting hardware provided Connect electrical in shaded area See...

Страница 11: ...e they are on then abort self clean cycle to unlock door Final Preparation All stainless steel body parts should be wiped with hot soapy water and with a liquid cleaner designed for this material If b...

Страница 12: ...__ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __...

Отзывы: