Viking DEV1200 Скачать руководство пользователя страница 5

5

INSTALLING THE WALL HOOD DUCT COVER 

1.  Measure from top of the canopy to ceiling and subtract 1/8” (0.3 cm) for clearance.
2.  Place the duct cover top inside the duct cover base and lower until desired height is found. (To eliminate

scratches, make a mark on the duct cover top for the desired lowering point by subtracting 18” (45.7 cm) from the
total height needed.)

3.  Use the retaining nuts and bolts to fasten in place.
4.  Slide the duct cover in place and fasten from inside canopy using the sheet metal screws provided.
5.  Note: For installations with ceilings above 9’ (22.9 cm), use optional duct extensions. See product literature for

details

Item 1

C

12”
(30.5 cm)

Duct Cover

Top

Duct Cover

Base

Item 2

A

Mín.

B

Max.

Item 4

Item 3

Canopy Top

Model

“A” Mín.

“B” Max

“C”

VCWH3048

12” (30.5 cm) 

24” (61.0 cm)

12” (30.5 cm)

VCWH3648

12” (30.5 cm) 

24” (61.0 cm)

12” (30.5 cm)

VCWH4248

12” (30.5 cm) 

24” (61.0 cm)

12” (30.5 cm)

VCWH4848

12” (30.5 cm) 

24” (61.0 cm)

18” (45.7 cm)

VCWH5548

12” (30.5 cm) 

24” (61.0 cm)

18” (45.7 cm)

VCWH6048

12” (30.5 cm) 

24” (61.0 cm)

24” (61.0 cm)

VCWH6648

12” (30.5 cm) 

24” (61.0 cm)

24” (61.0 cm)

Содержание DEV1200

Страница 1: ...including fire rated construction 2 Sufficient air is needed for proper combustion and exhausting of gases through the flue chimney of fuel burning equipment to prevent back drafting Follow the heatin...

Страница 2: ...FMs stated are based on tests at 1 static pressure without applying static pressure CFM would be greatly overstated 2 Duct run length is for general reference only for longer duct runs increase duct s...

Страница 3: ...ically result in the bottom of the hood being 66 167 6 cm to 72 175 3 cm above the floor The bottom of the hood should never be more than 72 182 9 cm above the floor or more than 36 91 4 cm above the...

Страница 4: ...er sized duct work and roof or wall cap for the type of blower you are using Recommended hood locations for the most common installations are shown on page 2 Adjust your measurements for various heigh...

Страница 5: ...the duct cover in place and fasten from inside canopy using the sheet metal screws provided 5 Note For installations with ceilings above 9 22 9 cm use optional duct extensions See product literature f...

Страница 6: ...screws provided Additional support can be added by running threaded rod from the ceiling to the top of the canopy at all four corners Holes must be drilled 6 Install blower See ventilation kit install...

Страница 7: ...DAMPER to VENTILATOR as shown using three 3 HEX SCREWS provided NOTE Damper flange to be captured by screw heads 2 Attach VENTILATOR to 4 THREADED STUDS on MOUNTING PLATE using 4 HEX NUTS provided 3 L...

Страница 8: ...lator to THREADED STUDS with two 2 HEX NUTS provided 4 Plug ventilator s POWER CORDS into RECEPTACLES inside the hood 5 Replace rear filter rail 6 Fasten the provided plate with 10 x 1 2 sheet metal s...

Страница 9: ...k to black white to white and green or bare ground to green ground screw provided Replace wiring box cover Make sure to connect remote wires to 2 prong male cord and service to 3 prong female cord 5 C...

Страница 10: ...ch of 2 12 Discard end of the blower should be pointed away from prevailing winds 8 Remove roofing nails from the upper two thirds of the shingles around the cutout area Carefully lift the shingles to...

Страница 11: ...g along the outer edge 8 Center the blower ring in the 11 27 9 cm diameter hole making sure that the 1 1 4 3 2 cm diameter electrical wiring hold aligns with the hole in the wiring box 9 Attach the bl...

Страница 12: ...cutout area Carefully lift the shingles to allow the back flashing sheet on the blower housing to fit under them 9 Center the blower ring in the 11 27 9 cm diameter hole making sure that the 1 1 4 3...

Страница 13: ...is recommended that the screws be located inside the blower housing All six holes in the back panel must be filled or any moisture that may get inside the housing could leak into the house 10 Using a...

Страница 14: ...XTERIOR BLOWER LINE IN 120 VAC 60 Hz 15 AMP MAX WIRING BOX GREEN BLAC WHITE WHITE BLACK GREEN GREEN WHITE WHITE BLACK BLACK DEV1200 DEV1500 22 1 8 56 2 cm B 10 1 8 25 7 cm A 29 1 2 74 9 cm 10 25 4 cm...

Страница 15: ...7 7 8 8 7 75 5 9 9 c cm m 1 14 4 1 15 5 1 16 6 3 37 7 9 9 c cm m 3 36 6 W W 3 35 5 7 7 8 8 9 91 1 3 3 c cm m 1 17 7 1 15 5 1 16 6 4 45 5 6 6 c cm m 4 42 2 W W 4 41 1 7 7 8 8 1 10 06 6 4 4 c cm m 2 20...

Страница 16: ...6 8 8 c cm m 2 26 6 1 15 5 1 16 6 6 68 8 4 4 c cm m 1 18 8 4 45 5 7 7 c cm m 6 60 0 W W 5 59 9 7 7 8 8 1 15 52 2 1 1 c cm m 2 29 9 1 15 5 1 16 6 7 76 6 0 0 c cm m 2 24 4 6 61 1 0 0 c cm m 6 66 6 W W 6...

Страница 17: ...6 6 4 45 5 6 6 c cm m 4 42 2 W W 4 41 1 7 7 8 8 1 10 06 6 4 4 c cm m 2 20 0 1 15 5 1 16 6 5 53 3 2 2 c cm m 600 CFM Internal Ventilation Installation 7 Duct Required 600 CFM Internal Ventilation Insta...

Страница 18: ...CHIMNEY HOODS A A B B C C 5 54 4 W W 5 53 3 7 7 8 8 1 13 36 6 8 8 c cm m 2 26 6 1 15 5 1 16 6 6 68 8 4 4 c cm m 1 18 8 4 45 5 7 7 c cm m 6 66 6 W W 6 65 5 7 7 8 8 1 16 67 7 3 3 c cm m 3 32 2 1 15 5 1...

Страница 19: ...19 WIRING DIAGRAM BUILT IN HOODS REFER ONLY TO FEATURES EQUIPPED WITH THIS UNIT...

Страница 20: ...VIKING 111 Front Street Greenwood Mississippi 38930 USA 662 455 1200 Specifications subject to change without notice F20251D PS0205VR...

Отзывы: