3/9
1.
Part examples and serial numbers A
。
2. Part examples and serial numbers B
。
3. Install the plate P1, central switchboard C3 and flat pulley
W1.
Because there is a small clearance between S1 and hole
of P1, this part needs to be adjusted in the following steps.
4. Install the driven pulley screw S5 and nut N5 to the plate P1.
5. Slide the profile F2 into the central plate P1.
As described
above, please adjust the S1,N4 and pulley W1 in step 3
repeatedly to ensure no clearance between pulley W1 and
profile F2. At the same time, it should slide smoothly.
6. Install the central plate P2 and flat pulley W1.
Because there
is a small clearance between S1 and hole of P2, this part
needs to be adjusted in the following steps.