9
Installation Instructions
Visit the ViewZ USA website at http://www.viewzusa.com
CM 308 series
Installation
G, H, I
Screws
G, H, I
Screws
J
Washer
C
- Monitor Hold Bracket
Direct Installation
Monitor Hold Bracket Installation
1)
Applicable VESA pattern - 50 x 50, 75 x 75, 100 x 100, 200 x 100
If your monitor supports a VESA plate already mounted on the back,
simply ensure the four M4/M5/M6 screws are in place and tightened.
If the mount is not already attached, connect it using the supplied
M4/M5/M6 VESA screws (4-places).
1)
Applicable VESA pattern - 200 x 100, 200 x 200
(Optional 400 x 400 available)
This stand is intended for use only with products that are
lighter than maximum weight indicated. Usage with
products heavier than the maximum weight indicated
may result in instability causing possible injury. This
product is intended to mount to a steel support truss, or
channel strut (Brick, Concrete or Wood)
Caution: Some installations may require running power and
video cables prior to attaching the monitor bracket to the pole. If
this is the case, do so before continuing to step 2.
Caution: Some monitors require specific length of screws.
Please check the affordable screw length before installing.
Max Load:
66.1 lbs / 30.0 kg
2)
Install the M4 x L15 mm screw, washers, and monitor-hold bracket
(if necessary) into the upper slotted hole according to the illustration
on the right. You will need to use Phillips screwdriver or mobile
screwdriver to fully tighten in the next step.
3)
Tighten the fasteners to secure the monitor at the desired angle.
*NOTE: Avoid over-tightening which can cause monitor damage