6
1
Bind Button
Press this button to perform the binding operation.
2
LED 1
When this LED is on, it means the air-to-ground link is connected; when this LED is off, it
means the air-to-ground link is disconnected.
3
LED 2
When this LED is on, it means the ground -to-air link is connected; when this LED is off, it
means the ground -to-air link is disconnected.
1
RF2 Port
Connect the 2nd air unit antenna to this port.
2
RF1 Port
Connect the 2nd air unit antenna to this port.
1
Fan Ventilation Outlet
Don’t block this fan ventilation outlet to ensure effective cooling.
1
2
1
1
② ③