VIEWEG
EN
Step 16 connect the I/O cord from smartBOX to robot
Step 17 connect the eco-PEN valve to the smartBOX
29
Operating Instructions smartBOX
Страница 1: ...DE Bedienungsanleitung smartBOX eco PEN Steuerung EN Operating Instructions smartBOX eco PEN control VIEWEG Version 2020 04 01 VIEWEG GmbH ...
Страница 2: ...y instructions 22 2 4 Safety Instructions for Auxiliary and Operating Materials 22 3 About your dispensing unit 23 4 Installation 24 4 1 Hardware 24 4 2 Software 30 5 Operation 31 5 1 Service menu 31 5 2 Status menu 32 5 3 Alarm 32 5 4 Programming JR VR 3000 robot series 33 6 Maintenance and Cleaning 35 7 Disposal 36 8 Technical data 36 9 Declaration of Conformity 37 Contents 19 Operating Instruct...
Страница 3: ...valves type eco PEN300 330 450 600 700 in combination with VR JR3000 dispensing robots 1 2 Intended Use The device is designed and constructed for commercial use It is only to be used for dis pensing liquid and paste materials such as adhesives lubricants various pastes grease oil silicone and other similar materials Any other use is considered improper If this device is used for other purposes pe...
Страница 4: ...ord 230 V AC Item no C 0043 I O cord to JR VR 3000 robots Item no C 0107 PCB board in ESD box Item no C 0108 internat PCB cord included in C 0108 PCB mounting bracket included in C 0108 retaining plate Item no 901436 USB pen drive Item no 990166 005 NOT included mounting plate only JR3200 option Item no 901526 21 Operating Instructions smartBOX ...
Страница 5: ...ntended for indoor use only 2 3 Electrical safety instructions Before opening the dispensing unit disconnect it from the power supply by disconnecting the input power cord Failure to disconnect input power may risk electrical shock Maintenance of the unit only by authorized and ap proved personnel The unit may only be operated by a trained and authorized electrical personnel Operate the device exc...
Страница 6: ...EWEG 1 3 2 4 6 5 7 EN 3 About your dispensing unit 1 Display 2 Operating controls 3 eco PEN connector port 4 I O port 5 Main Power input 6 Fuse 2 amp 7 Main power switch 23 Operating Instructions smartBOX ...
Страница 7: ...VIEWEG EN 4 Installation Step 1 open the robot on the backside Step 2 take away the cover under the worktable Step 3 remove the marked screw 4 1 Hardware 24 Operating Instructions smartBOX ...
Страница 8: ...over from main body of robot housing Step 5 unscrew the marked screws on left and right side of robot front cover Step 4 disconnect the home sensor of the X axis and let the cord fall inside the robot housing 25 Operating Instructions smartBOX ...
Страница 9: ...p 7 remove the marked screws from the main PCB board Step 8 mount the 4 mounting bolts instead of removed screws Step 9 mount the PCB and fix it with the removed screws from before 26 Operating Instructions smartBOX ...
Страница 10: ...VIEWEG EN Step 10 mount the connector on the robot backside at position I O MT Step 11 connect the two connectors to the PCB 27 Operating Instructions smartBOX ...
Страница 11: ... opposite direction Step 13 mount the retaining plate to the side mounted terminal box Step 14 remove the top cover screws and use them for fixing the smartBOX cover Step 15 mount the smartBOX and fix it with the screws from Step 14 28 Operating Instructions smartBOX ...
Страница 12: ...VIEWEG EN Step 16 connect the I O cord from smartBOX to robot Step 17 connect the eco PEN valve to the smartBOX 29 Operating Instructions smartBOX ...
Страница 13: ...s switch OFF robot power plug in the USB pen drive to frontside MEMORY port switch ON robot power the update of robot firmware starts automatically wait until update is finished switch OFF robot power unplug the USB pen drive Now the system is ready for operation 30 Operating Instructions smartBOX ...
Страница 14: ...ss the smartBOX display switch automatically after 3 sec to the STATUS Menu NO after booting process the smartBOX display stays in smartBOX screen Dispense YES smartBOX has normal function incl dispensing NO Although dispensing is active in the robot settings the ecoPEN valve does not dispense needed for TEST RUN for running the Robot program without dispensing Save save the actual settings and le...
Страница 15: ...ng eco PEN suckback is running OFF 5 3 Alarm If the smartBOX does not get any encoder feedback from eco PEN Motor for example if Encoder is broken or the motor is blocked because of a defective eco PEN pump the display shows following ERROR message Check the eco PEN valve If something is blocked or if the motor or encoder is defect press ESC to Restart the smartBOX 32 Operating Instructions smartB...
Страница 16: ...ing eco PEN Models select eco PEN model Recommendation EXECUTE AUTO RECOGNITION Flow Rate Conv Coef Internal calibration factor for flowrate calibration Flow Rate Adj Value manual calibration factor 90 110 for flowrate adjustment Flow Rate Max ml min software limitation of flowrate Waiting Time to Suckback Wait time between end of dispensing and eco PEN suckback Suckback Amount Quantity of eco PEN...
Страница 17: ...fter end of dispensing Dispense Amount Decision Valid Information if Dispense Amount measured via eco PEN encodersteps was in tolerance or not get forwarded to smartBOX Invalid Information if Dispense Amount measured via eco PEN encodersteps was in tolerance or not get not forwarded to smartBOX Decision Threshold tolerance for Dispense Amount measurement via eco PEN Encodersteps not real dispense ...
Страница 18: ... Dispense Amount dispensing quantity by using Purge function Purge Dispense Amount Unit unit for dispensing quantity by using Purge function Purge Flow Rate flowrate by using Purge function Purge Flow Rate Unit unit for flowrate by using Purge function 6 Maintenance and Cleaning The smartBOX is maintenance free Any needed repairs must be performed by an authorized repair center or only by sending ...
Страница 19: ... Equipment WEEE electrical equipment must be returned to the collection points set up for this purpose in order to be reused 8 Technical data Outer dimensions W x H x D 270 x 80 x 80 mm weight approx 0 80 kg Power supply 85 264 V AC 50 60 Hz Internal voltage 24 V DC Display 2 4 TFT compatible robot types VR3000 series VIEWEG JR3000 series JANOME compatible eco PEN valves eco PEN300 eco PEN330 eco ...
Страница 20: ...d by us complies with the applicable regulations and the relevant provisions Product eco PEN Valve Controller Type smartBOX Manufacturer VIEWEG Dosier und Mischtechnik Gewerbepark 13 85402 Kranzberg Germany Tel 49 8166 6784 0 Fax 49 8166 6784 20 The following harmonised European standards have been applied DIN EN ISO 61000 6 3 Interference emissions DIN EN ISO 61000 6 2 Interference immunity Till ...
Страница 21: ...www dosieren de VIEWEG GmbH Dosier und Mischtechnik Gewerbepark 13 85402 Kranzberg Deutschland Germany Tel 49 8166 6784 0 info dosieren de www dosieren de www dosieren de VIEWEG ...