[ EN
●
7 ]
Version: 2:0
KEN002DH 22.08.2019
6. 4pcs ST4*8 big flat screws will be used to connect the inside chimney into the hanging board, then put on
the outside chimney, a hook will be used to put up the outside chimney in order to the next installation, see
pic 5.Install the v-flap to the outlet.See Pic 6.
7. Hold up the hood, 16pcs M4*10 big flat screws will be used to connect the hood body into angle iron, see pic
8. Install the expansion pipe to the outlet and connect the power supply.See Pic 8.Put the expansion pipe on
the outlet; after ensure all the things ok, put down the hook, take from the outside chimney, all the installation is
finished, see pic 9.
inside chimney
outside chimney
pic 5
pic 6
pic 7
pic 8
pic 9
Содержание VDI90230EG
Страница 14: ... EN 14 Version 2 0 KEN002DH 22 08 2019 120 mm 33 mm 6 m m ...
Страница 30: ... DE 30 Version 2 0 KEN002DH 22 08 2019 120 mm 33 mm 6 m m ...
Страница 46: ... FR 46 Version 2 0 KEN002DH 22 08 2019 120 mm 33 mm 6 m m ...
Страница 62: ... IT 62 Version 2 0 KEN002DH 22 08 2019 120 mm 33 mm 6 m m ...
Страница 78: ... ES 78 Version 2 0 KEN002DH 22 08 2019 120 mm 33 mm 6 m m ...