27
5354 788 - 03
Vitorond 200, VD2A Series Installation
Connections
Boiler Control Installation
1. Drill four Ø
d
in. (3 mm) holes on the side panel
as shown. For left-side mount use a mirror image
of the drawing.
2. Punch a Ø
7
/
8
in. (Ø 22 mm). opening.
3. Install control harness bracket using supplied 8-32
self-tapping screws.
4. Install burner harness bracket and tighten using two
supplied screws.