Control Connections
42
Electrical Connections
(continued)
Power/Pump module electrical connectors
Legend
40
- Power supply
20A
- System pump
sA
- DHW pump
sÖ
- Boiler pump
sK
- DHW recirculation pump
50
- Fault alarm output
143
- External blocking terminals 2-3
External demand terminals 1-2
External heating program
changeover terminals 1-2
The allocation of the function
“external heating program
changeover” is set via coding
address ’91’
144
- External 0-10V signal
145
- KM BUS to boiler control board
See Vitodens 200-W WB2B
Start-up/Service Instructions
for applicable system coding
information.
5
3
6
9
2
9
7
v
1
.6
N
L
143
28
L G N
L2
N
L
N
L
N
L
L1 G N
50
20
21
20A
40
N
L
120/230
Transformer
145
144
143
Power/Pump Module
1 2 3
1 2 3
1 2 3
1 2 3
145
144
1 2 3
1 2 3
50
20
21
20A
40
Fig. 36
Содержание Vitodens 200-W 19 WB2B Series
Страница 61: ...61 5369 297 v1 6...
Страница 62: ...62 5369 297 v1 6...
Страница 63: ...63 5369 297 v1 6...