5
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checking the high limit safety cut-out setting
.............
7
•
2. Filling the heating system with water and venting
......
7
•
3. Fully opening the rotary damper in the flue outlet and
locking it again
................................................................
7
•
•
•
4. Commissioning the system
...........................................
7
•
5. Minimising pulsation noise
............................................
8
•
•
6. Shutting down the system
.............................................
9
•
•
7. Opening the boiler door
.................................................
9
•
•
8. Separating the neutralising system from the boiler
and connecting the drain hose
......................................
9
•
•
9. Cleaning the combustion chamber and heating
surfaces
........................................................................... 10
•
•
10. Checking gaskets and thermal insulation parts
.......... 10
•
•
11. Checking all connections and the sensor well on the
heating water side for leaks
........................................... 11
•
•
12. Checking the function of the safety equipment
........... 11
•
•
•
13. Checking the diaphragm expansion vessel and
system pressure
............................................................. 11
•
•
14. Checking the flue gas collector for leaks
..................... 13
•
15. Cleaning the sight glass in the boiler door
.................. 14
•
•
16. Closing the boiler door
.................................................. 14
•
17. Checking the thermal insulation
................................... 14
•
•
18. Checking the mixer for ease of operation and leaks
... 14
•
•
19. Checking the water quality
............................................ 15
•
•
20. Cleaning and reconnecting the condensate drain
system
............................................................................. 15
•
21. Checking the installation room ventilation
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692 909 GB
Содержание Vitocrossal 300 CT3 SERIES
Страница 19: ...19 206 229 207 207 231 231 231 228 200 201 206 082 082 Parts lists Parts lists cont 5692 909 GB...
Страница 20: ...20 202 203 087 090 206 207 207 207 230 230 093 Parts lists Parts lists cont 5692 909 GB...
Страница 21: ...21 C 237 216 208 234 220 209 210 222 217 Parts lists Parts lists cont 5692 909 GB...
Страница 22: ...22 221 236 211 232 238 235 B 233 239 214 226 223 225 224 227 215 240 Parts lists Parts lists cont 5692 909 GB...
Страница 23: ...23 076 077 073 074 075 098 097 095 069 071 070 072 096 096 099 Parts lists Parts lists cont 5692 909 GB...
Страница 24: ...24 087 086 087 086 081 080 084 083 Parts lists Parts lists cont 5692 909 GB...
Страница 33: ...33 5692 909 GB...
Страница 34: ...34 5692 909 GB...
Страница 35: ...35 5692 909 GB...