Safety
4
Important Regulatory and Installation Requirements
Codes
The installation of indirect-fired hot
water storage tanks in boilers and solar
system applications might be governed
by individual local rules and regulations
for this type of product, which must be
observed. Always use latest editions of
codes.
In the Commonwealth of
Massachusetts, all plumbing work must
be done by a licensed plumber or
gas-fitter and for gas installations, all
gas piping must be done by a licensed
gas-fitter.
Mechanical room
Ensure the mechanical room complies
with the requirements of the system
design guideline and/or Technical Data
Manual (available from your Viessmann
sales representative).
The tank must be installed in a
mechanical room which is never subject
to freezing temperatures.
Ensure water in tank is drained if not in
use and danger of freezing exists in the
mechanical room.
Please carefully read this manual prior
to attempting installation. Any
warranty is null and void if these
instructions are not followed.
This product must be installed
observing not only the information
and instructions provided in the
pertinent product literature (see list on
following page), but also all local,
provincial/state plumbing and building
codes, as they apply to this product
and all periphery equipment.
For information regarding other
Viessmann System Technology
componentry, please reference
documentation of the respective
product (available from your
Viessmann sales representative).
We offer frequent installation and
service seminars to familiarize our
partners with our products. Please
inquire.
Working on the equipment
The installation, adjustment, service,
and maintenance of this equipment
must be done by a
licensed professional
heating contractor
who is qualified and
experienced in the installation, service,
and maintenance of hot water heating
systems. There are no user serviceable
parts on this equipment.
Ensure
main power
supply to
equipment, the heating system, and all
external controls has been
deactivated
.
Close
main
oil or gas supply valve
. Take
precautions to avoid accidental
activation of power during service
work.
The completeness and functionality of
field supplied electrical controls and
components must be verified by the
heating contractor. These include
low-water cut-offs, flow switches (if
used), staging controls, pumps,
motorized valves, air vents,
thermostats, temperature controls, etc.
5285
658
v2
.1
If the heating system itself is to be
filled with Glycol or any other
antifreeze, the system fill must be of
non-toxic or food grade antifreeze. In
any circumstance, a non-toxic fluid
must be used. Ensure a copy of the
Material Safety Data Sheet (MSDS) is
supplied to the operator/ultimate
owner of the system. The use of
Viessmann supplied “Tyfocor-HTL”
solar fill is recommended for the solar
heating circuit.
WARNING
Содержание Vitocell-B 100 CVB Series
Страница 22: ...22 5285 658 v2 1 ...
Страница 23: ...23 5285 658 v2 1 ...