Set-up and Connections
10
120 USG / 450 ltr Tank Installation
Thermal insulation and thermometer installation
All necessary parts for enclosure assembly are packaged in a separate carton.
1. If not already installed, fit the
thermal insulation blanket below the
tank prior to the installation of the
tank itself.
2. Position and level the DHW tank
with its leveling bolts.
3. Push the thermal insulation jacket at
the front into the flange.
4. Guide the two thermometer sensor
cables through the provided
openings and push in the
thermometers.
5. Push sensor of upper thermometer
all the way into the clamping
bracket.
6. Position the lower sensor on the
outside of the location spring (not in
the groove), so that it is flush with
the front of the spring. Insert the
lower sensor mounting hardware
with the sensor until it bottoms out
inside the well (see steps 4-6 on
page 8).
Note
If no thermometers are fitted, cap the
holes with plugs.
5285
658
v2
.1
1.
Fig. 7
3.
4.
6.
5.
5.
5.
Fig. 8
The thermal insulation must not come
in contact with open flames. Exercise
extreme caution when welding and
soldering.
CAUTION
Содержание Vitocell-B 100 CVB Series
Страница 22: ...22 5285 658 v2 1 ...
Страница 23: ...23 5285 658 v2 1 ...