13
Minimum clearances for 2-stage (type BW 351.B +
BWS 351.B)
≥
400
≥
1500
A
= 300
≥
400
Fig. 4
A
Clearance subject to on-site installation and site
conditions
Note
■
Observe clearances for installation and mainte-
nance.
■
Additional strain relief clamps are required for the
power cables if the clearance behind the heat pump
is more than 80 mm.
Preparing for installation
Siting and transport requirements
(cont.)
5855006
Installation