9
Initial start−up, inspection and maintenance
Further details regarding the individual steps
(cont.)
Checking nozzle pressure
1.
Close the gas shut−off valve.
2.
Release the screw inside test
nipple
A
, but do not remove
completely, and connect the
pressure gauge.
3.
Open the gas shut−off valve.
Start up the boiler.
4.
Check the nozzle pressure.
In case of deviation from the
value in the table on page10
,
remove protective cap
B
.
Adjust the nozzle pressure
with screw
C
.
5.
Check setting values and record
in the service report.
6.
Fit cap
B
.
7.
Switch OFF the system at the
control unit (the boiler shuts
down), close the gas shut−off
valve, remove the pressure
gauge and close test nipple
A
with the screw.
8.
¨
Safety instructions
Open the gas shut−off valve,
start up the boiler and check
soundness of test nipple
A
.
5692413GB
C
B
A
Содержание GS1
Страница 22: ...22 Parts list Parts list cont 5692 413 GB 206 207 005 A 200 207 004 001 006 001 002 2 003 2 002 1 ...
Страница 23: ...23 Parts list Parts list cont 5692 413 GB 100 102 115 113 101 109 121 103 C D 112 106 105 110 111 3 4 114 ...
Страница 24: ...24 Parts list Parts list cont 5692 413 GB 007 108 104 120 ...
Страница 25: ...25 Parts list 5692 413 GB ...
Страница 27: ...27 Appendix Maint service Maint service Maint service Maint service 5692 413 GB ...
Страница 29: ...29 Appendix Maint service Maint service Maint service Maint service 5692 413 GB ...
Страница 31: ...31 Appendix Maint service Maint service Maint service Maint service 5692 413 GB ...
Страница 35: ...35 5692 413 GB ...