8
Initial start−up, inspection and maintenance
Further details regarding the individual steps
(cont.)
6.
Check the supply (flow) pressure;
it should be
H
17.4 to 25mbar for natural gas,
H
42.5 to 57.5mbar for LPG.
Record the actual value in the
service report.
Take the action shown in the table.
Supply pressure (flow pressure)
for
Remedy
natural gas
LPG
below
17.4mbar
below
42.5mbar
Make no adjustments and notify your
mains gas or LPG supplier.
17.4 to 25mbar 42.5 to
57.5mbar
Start up boiler.
above 25mbar
above
57.5mbar
Install a separate gas governor
downstream of the system and regulate
the pressure to 20mbar for natural gas or
50mbar for LPG.
Notify your mains gas or LPG supplier.
7.
Shut down the boiler, close the
gas shut−off valve, remove the
pressure gauge, and close test
nipple
A
with the screw.
8.
¨
Safety instructions
Open the gas shut−off valve and
check test nipple
A
for
soundness.
5692413GB
Содержание GS1
Страница 22: ...22 Parts list Parts list cont 5692 413 GB 206 207 005 A 200 207 004 001 006 001 002 2 003 2 002 1 ...
Страница 23: ...23 Parts list Parts list cont 5692 413 GB 100 102 115 113 101 109 121 103 C D 112 106 105 110 111 3 4 114 ...
Страница 24: ...24 Parts list Parts list cont 5692 413 GB 007 108 104 120 ...
Страница 25: ...25 Parts list 5692 413 GB ...
Страница 27: ...27 Appendix Maint service Maint service Maint service Maint service 5692 413 GB ...
Страница 29: ...29 Appendix Maint service Maint service Maint service Maint service 5692 413 GB ...
Страница 31: ...31 Appendix Maint service Maint service Maint service Maint service 5692 413 GB ...
Страница 35: ...35 5692 413 GB ...