![Viessmann CVBA Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/viessmann/cvba/cvba_installation-instructions-for-contractors_1016868013.webp)
13
Route the cable.
Fig. 12
Guide the SDIO/SM1A or SD1cable through the
recess in the Solar-Divicon to the back. Route it under
the thermal insulation to the back strip.
Note
To make it easier to route the power cable behind the
Solar-Divicon, group wires together with adhesive
tape.
!
Please note
Hot components can damage cables.
Route power cable over top thermal insulation
mat.
Closing the thermal insulation
1.
Fig. 13
Fitting the Solar-Divicon and thermal insulation
(cont.)
5838690
Содержание CVBA
Страница 22: ...22 5838690 ...
Страница 23: ...23 5838690 ...