![Viessmann CVBA Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/viessmann/cvba/cvba_installation-instructions-for-contractors_1016868011.webp)
11
Fitting the profile bracket
1.
Fig. 8
Note
After fitting the profile bracket, check that no parts of
the thermal insulation jacket are trapped under the
spacer sleeves or profile bracket.
Fitting the overflow pipe
1.
2.
Fig. 9
1.
Connect overflow pipe.
2.
Tighten the nut with a torque of 50 Nm.
Fitting the Solar-Divicon and thermal insulation
(cont.)
5838690
Содержание CVBA
Страница 22: ...22 5838690 ...
Страница 23: ...23 5838690 ...