Note
During commissioning, the combustion controller carries out an automatic calibration.
Only test the emissions approx. 30 s after the burner has started.
1.
Connect a flue gas analyser at flue
gas aperture
A
on the boiler flue
connection.
2.
Open the gas shut-off valve, start the
boiler and create a heat demand.
3.
Select the lower output (see
page 30).
4.
Check the CO
2
content. Should the
actual value deviate from the above
ranges by more than 1 %, implement
steps from page 29.
5.
Enter actual values into the report.
6.
Select the upper output (see
page 30).
7.
Check the CO
2
content. Should the
actual value deviate from the above
ranges by more than 1 %, implement
steps from page 29.
8.
After testing, press
OK
.
9.
Enter actual values into the report.
Select higher/lower output
1.
Press
OK
and
å
simultaneously
for approx. 4 s.
2. "Actuator test"
3.
Select the lower output:
Select
"Base load start"
and confirm
with
OK
.
4.
Select the upper output:
Select
"Full load start"
and confirm
with
OK
.
Matching the control unit to the heating system
Subject to the equipment level, the control unit must be matched to the system. Var-
ious system components are recognised automatically by the control unit and the
relevant codes are adjusted automatically.
■ For the selection of an appropriate scheme, see the following diagrams.
■ For coding steps, see page 56.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)