11
Initial start−up, inspection and maintenance
Further details regarding the individual steps
(cont.)
Gas supply pressure (flow pressure)
7.
Check the supply pressure (flow
pressure), see the table below.
Use test equipment with a
resolution of at least 0.1mbar.
Record the actual values in the
service report from page46.
Take the action shown in the table.
Please note:
At a flow pressure under
17.4mbar, also check the filter
downstream of flange
D
on the
gas supply pipe (see page10), for
contamination.
8.
Shut down the boiler, close the
gas shut−off valve, remove the
pressure gauge, and close test
nipple "PE"
C
with the previously
removed screw.
Refit the mounting plate with the
burner control unit.
Torque: 2Nm
9.
¨
Safety instructions
Open the gas shut−off valve and
check test nipple "PE" and all gas
connections for soundness.
Supply pressure
(flow pressure)
Remedy
below 15mbar
Do not start up boiler notify your gas supply
company.
15 up to 17.4mbar
¨
Boiler may only be operated temporarily
with these settings (emergency mode).
Notify your gas supply company.
17.4 up to 50mbar
Start up boiler.
above 50mbar
Install a separate gas governor upstream of
system and regulate pressure to 20mbar.
Notify your gas supply company.
5692500GB
Содержание CU3
Страница 38: ...38 Burner Component summary 5692 500 GB M A B C D E L K H G F M H F N G O K ...
Страница 42: ...42 Parts list Parts list cont 5692 500 GB 201 205 213 1 212 1 202 208 209 210 A B C ...
Страница 43: ...43 Parts list Parts list cont 5692 500 GB 206 203 209 204 211 211 211 211 211 211 201 200 ...
Страница 45: ...45 Parts list Parts list cont 5692 500 GB 003 003 008 009 005 008 001 002 007 004 006 ...
Страница 47: ...47 Appendix Maint service Maint service Maint service Maint service 5692 500 GB ...
Страница 49: ...49 Appendix Maint service Maint service Maint service Maint service 5692 500 GB ...
Страница 51: ...51 Appendix Maint service Maint service Maint service Maint service 5692 500 GB ...