8
Removing the base frame for handling (if necessary)
If necessary, the base frame can be removed for han-
dling.
4x
2.
1.
Fig. 3
Danger
If the boiler is not secured, it can slide off the
base frame and cause injury.
Secure the boiler body. Wear safety boots.
1.
Undo the 4 screws and remove.
2.
Lift the boiler off the base frame.
!
Please note
If the drain connector is left unprotected, it
can be damaged while the boiler is being
transported and set down without the base
frame.
Set the boiler down carefully; place timber
below if necessary.
3.
Fit the base frame in reverse order.
Torque for fixing screws 40 Nm
Siting and levelling the boiler
(cont.)
5799212
Содержание CM2C
Страница 19: ...19 Fig 14 Fitting the thermal insulation and casing cont 5799212 ...
Страница 31: ...31 5799212 ...