30
Connecting the primary circuit
!
Please note
The components used must be
resistant to the heat transfer
medium.
Never use zinc-plated pipes.
1.
Equip the primary circuit with an
expansion vessel and safety valve (in
accordance with DIN 4757).
Note
■ Expansion vessel must be
approved to DIN 4807. Dia-
phragms of expansion vessel and
safety valve must be suitable for
the heat transfer medium.
■ Discharge and drain pipes must
terminate in one container that can
hold the maximum possible expan-
sion volume of the heat transfer
medium.
2.
Ensure adequate thermal and sound
insulation of all pipes routed through
walls.
3.
Connect primary pipes to heat
pump.
4.
Insulate pipes inside the building to
provide protection from heat and
vapour diffusion.
Connecting the secondary circuit
F
E
D
C
Safety assembly supplied
C
Pressure gauge
D
Connection G1
E
Quick-action air vent valve
F
Safety valve
1.
Equip the secondary circuit on site
with an expansion vessel and the
safety assembly supplied (in accord-
ance with DIN 4757).
Fit the safety assembly to the on-site
pipe in the heating water return
or
to the primary circuit/secondary cir-
cuit connection set (accessories).
Connection set installation
instructions
2.
Connect secondary pipes to the heat
pump.
Installation sequence
Hydraulic connections
(cont.)
5601 598 GB
Содержание BWT 241.A Series
Страница 18: ...18 Removing the cylinder module 3 1 5 4 2 2x Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 19: ...19 6 X3 sG sH lJ aYH 7 F6 F18 8 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 20: ...20 aCH 11 10 193C SLP N 224 6 9 Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 21: ...21 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 22: ...22 4x 4x 6x 2x 22 19 21 20 Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 23: ...23 4x 23 2x 26 25 24 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 27: ...27 C D BB Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 598 GB Service...
Страница 72: ...72 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 598 GB...
Страница 81: ...81 0001 0005 0006 0003 0008 0009 0010 0007 0004 0002 Parts lists type BWT 400 V Casing cont 5601 598 GB Service...
Страница 105: ...105 0006 0005 0004 0001 0003 0002 0002 0003 Parts lists type BWT M 230 V Fitting set cont 5601 598 GB Service...
Страница 123: ...123 5601 598 GB...