52
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
.................................................. 53
•
2. Writing reports
................................................................ 53
•
•
•
3. Checking the refrigerant circuit for leaks
..................... 54
•
4. Filling and venting on the primary side
........................ 54
•
5. Filling and venting on the secondary side
................... 55
•
6. Filling and venting the solar circuit
.............................. 56
•
•
•
7. Checking the expansion vessel and heating circuit
pressure
........................................................................... 57
•
8. Cleaning the DHW cylinder
............................................ 57
•
9. Replacing the magnesium anode
.................................. 59
•
•
10. Checking the tightness of electrical connections
•
•
•
11. Closing the heat pump
•
•
•
12. Closing the heat pump, switching on main fuse/MCB
•
13. Commissioning the system
........................................... 59
•
•
•
14. Checking the system function (e.g. actuators,
temperatures, poss. heat meter)
................................... 66
•
15. Instructing the system user
........................................... 66
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5601 598 GB
Содержание BWT 241.A Series
Страница 18: ...18 Removing the cylinder module 3 1 5 4 2 2x Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 19: ...19 6 X3 sG sH lJ aYH 7 F6 F18 8 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 20: ...20 aCH 11 10 193C SLP N 224 6 9 Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 21: ...21 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 22: ...22 4x 4x 6x 2x 22 19 21 20 Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 23: ...23 4x 23 2x 26 25 24 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 27: ...27 C D BB Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 598 GB Service...
Страница 72: ...72 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 598 GB...
Страница 81: ...81 0001 0005 0006 0003 0008 0009 0010 0007 0004 0002 Parts lists type BWT 400 V Casing cont 5601 598 GB Service...
Страница 105: ...105 0006 0005 0004 0001 0003 0002 0002 0003 Parts lists type BWT M 230 V Fitting set cont 5601 598 GB Service...
Страница 123: ...123 5601 598 GB...