![Viessmann BM-123/177 Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/viessmann/bm-123-177/bm-123-177_overview_1016767037.webp)
Subject to changes due to technical improvements
ESS Energie Systeme & Service GmbH
CHP accessory range – 01/2010
37
5368 463
Service and training
7
7.1.3 Test run after commissioning (in Germany)
Article number
CHP module type
ESS
Viessmann
for all CHP module types
900-00-0011
7000762
Scope of service
• Additional 8 h supervised test run in conjunction with commissioning
• Suitable testers to be provided on site, e.g. heat and gas meters
Test run after
In other countries according to costs plus travel expenses beyond the German border upon production of
commissioning
receipts plus 10 %
(international)
Handling fee (+ art. no. 7000985)
7.1.4 Order processing support / installation inspection (in Germany)
Article number
CHP module type
ESS
Viessmann
for all CHP module types
900-00-0100
7000780
Meeting on site
1 day (incl. travelling time), for example for installation inspections, site meetings, additional training,
(in Germany)
separate acceptance procedures and similar
Order processing
In other countries according to costs plus travel expenses beyond the German border upon production of
support (international)
receipts plus 10 % handling fee (+ art. no. 7000986)
7.1.5 Warranty preservation
Article number
CHP module type
ESS
Viessmann
for all CHP module types
900-00-0010
7000779
Preservation of the
• Preservation to maintain the warranty
CHP system (in Germany)
• Preservation of the CHP module on site (in Germany) 24 weeks following delivery or after 12 weeks
out of use; thereafter every 24 weeks
• As part of this, every module must regularly be run on idle for a few minutes to protect the system
against corrosion as a result of the relative humidity. The internal lubrication pump delivers the
lubricant provided on-site, to any parts at risk, particularly to the cylinder head area.
• These tasks should be carried out by qualified specialist contractors.