25
5461 889 - 16
Vitodens 222-F, B2TB 19, 35, 68, 125 Installation
Vertical Piping Installation
(continued)
Boiler Connections
1. Install the supplied locking clips over the bottom
boiler connection and pipes.
2. Remove the cap from the factory installed gas line.
3. Install the supplied tees, drain valves and gas valve
as shown.
4. Install security clips to the DHW pipe retaining clips.