47
Note
According to EN 806, a visual inspection and (if neces-
sary) cleaning must be carried out no later than two
years after commissioning, and as required thereafter.
1.
8x
3.
2.
A
Fig. 37
1.
Drain the loading cylinder.
2.
Remove flange cover
A
.
3.
Disconnect the loading cylinder from the pipework
to prevent contamination from entering the pipe-
work.
4.
Remove loose deposits with a high pressure
cleaner.
!
Please note
When cleaning the inside,
only use plastic cleaning utensils.
5.
Use a chemical cleaning agent to remove hard
deposits that cannot be removed with a high pres-
sure cleaner.
!
Please note
Never use hydrochloric acid
based cleaning agents.
6.
Thoroughly flush the loading cylinder after clean-
ing.
Checking and replacing the magnesium anode (if required)
Check the magnesium anode. If it is discovered that
the anode has degraded to 10 to 15 mm Ø, we recom-
mend replacing the magnesium anode.
Commissioning, inspection, maintenance
Cleaning the loading cylinder
5789 302 GB
Содержание B2TB
Страница 6: ...6 15 Keyword index 152 Index Index cont 5789 302 GB ...
Страница 12: ...12 1 4 2x 3 2 5 Fig 5 Installing the boiler Removing the front panels 5789 302 GB Installation ...
Страница 26: ...26 2 2x 4 1 5 3 Fig 19 Installing the boiler Fitting the front panels 5789 302 GB Installation ...
Страница 117: ...117 Parts lists Hydraulics 5789 302 GB Components ...
Страница 128: ...128 0008 0009 0004 0005 0006 0003 0002 0001 0007 Fig 75 Parts lists Miscellaneous 5789 302 GB Components ...
Страница 154: ...154 5789 302 GB ...
Страница 155: ...155 5789 302 GB ...