5
A
B
0°
A
Neutralising system
B
Condensate lifting system
1.
Remove the cover from the con-
tainer and take out the small parts
supplied.
2.
Fit supply hose connection (either
DN 20 or DN 25) with a gasket and
nuts.
3.
Install the condensate lifting system
in the required location.
4.
Route the supply hose to the con-
densate lifting system with a fall.
Secure the hose with hose clips.
Note
Never step on the hose. Protect the
hose against mechanical damage.
5.
Route the drain hose into the drain-
age system. Secure the hose with
hose clips.
Note
■ Secure the free end of the drain
hose, because water flows out
under pressure
■ If the drain hose is extended
and/or constricted by hose con-
nectors, this leads to a reduction
in the pump rate/delivery head
6.
Close the condensate lifting system
cover.
Positioning and connecting
5601325
Содержание 7441 770
Страница 16: ...16 Declaration of Conformity 5601325 ...
Страница 17: ...17 5601325 ...
Страница 18: ...18 5601325 ...
Страница 19: ...19 5601325 ...