
Place the cartridge valve on straight and carefully screw in (fine
thread).
Screw in cartridge valve (SW 17).
Set flush volume.
n
inside position: 2 l
n
outside position: 4 l
Open shut-off valve.
3.2.2
Mounting the basic panel
In the next step, the basic panel of the flush plate must be mounted.
Requirements:
n
The installation duct is ready for installation.
n
The cartridge valve is mounted and set.
Screw on basic panel loosely.
Align basic panel horizontally and tighten screws.
Handling
Visign for More 104 equipment set
9 from 12