Viega Visign Скачать руководство пользователя страница 8

3 Handling

3.1

Assembly information

3.1.1

Required material and tools

The following tools are required for mounting:

n

flat screwdriver

n

spanner (SW 17)

n

handsaw

3.2

Assembly

3.2.1

Insert cartridge valve

Requirements:

n

the pre-wall element has been mounted

n

the tiling work is completed.

n

the revision opening is freely accessible

n

the urinal ceramic has been mounted

Open the shut-off with a screw driver for a few seconds to rinse the
pipeline.

Re-close shut-off.

Remove seal (SW 17).

Tool

Handling

Visign for More 104 equipment set

8 from  12

Содержание Visign

Страница 1: ...for Viega urinal flushing system Visign installation set Model Year built 8354 2 from 09 2007 en_INT Visign for More 104 equipment set Instructions for Use...

Страница 2: ...Visign for More 104 equipment set 2 from 12...

Страница 3: ...2 3 Product description 6 2 3 1 Overview 6 2 3 2 Technical data 7 3 Handling 8 3 1 Assembly information 8 3 1 1 Required material and tools 8 3 2 Assembly 8 3 2 1 Insert cartridge valve 8 3 2 2 Mounti...

Страница 4: ...oes not extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labellin...

Страница 5: ...ermany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant nat...

Страница 6: ...y Flush flow DIN 3265 Noise class DIN 4109 2 2 Intended use 2 2 1 Areas of use The equipment set is intended for the actuation of flushes in urinals 2 2 2 Maintenance The cartridge valve should be cle...

Страница 7: ...ta Minimum flow pressure 0 05 0 5 MPa 0 5 5 bar Flush flow see Regulations from section Technical data on page 6 0 3 0 7 l s Noise class see Regulations from section Technical data on page 6 Class 2 P...

Страница 8: ...bly 3 2 1 Insert cartridge valve Requirements n the pre wall element has been mounted n the tiling work is completed n the revision opening is freely accessible n the urinal ceramic has been mounted O...

Страница 9: ...n 4 l Open shut off valve 3 2 2 Mounting the basic panel In the next step the basic panel of the flush plate must be mounted Requirements n The installation duct is ready for installation n The cartri...

Страница 10: ...e actuating rod The tip of the rod must lie 17 mm behind the front edge of the basic panel Shorten the actuating rod with a saw Turn the actuating rod into the cartridge and counter with the threaded...

Страница 11: ...sary replace Chapter 3 4 2 Cleaning cartridge valve on page 11 3 4 Care and maintenance 3 4 1 Maintenance tips Normal soap or a mild cleaning agent can be used for regular care and prevention of lime...

Страница 12: ...flush plate in acc with Chapter 3 2 1 Insert cartridge valve on page 8 Chapter 3 2 3 Mounting the flush plate on page 10 3 5 Disposal Separate the product and packaging materials e g paper metal plast...

Отзывы: