background image

The following are effective:

n

Fixed and gliding points

n

Expansion equalisation joints (expansion bends)

n

Compensators

Heat expansion co-efficient of copper

Material

Heat expansion co-effi‐

cient 

 

[

mm

/

mK

]

Example:

Length expansion with

pipe lengths = 20 m

and 

Δ

T = 50 K 

[mm]

Copper

0.0166

16.6

Fig. 2: Length expansion of copper pipes

1 -  Length expansion 

⃗Δ

[

mm

]

2 -  Pipe length 

 l

0

 

[

m

]

3 -  Temperature difference 

⃗Δϑ

 

[

K

]

The length expansion 

Δ

l can be taken from the diagram or can be cal‐

culated using the following formula:

Δ

=

 

 

[

mm

/

mK

]

 

×

 L 

[

m

]

 

x

 

Δϑ

 

[

K

]

Product information

Profipress S

10 from  24

Содержание Profipress S

Страница 1: ...Year built from 01 2008 en_INT Profipress S Instructions for Use...

Страница 2: ...Profipress S 2 from 24...

Страница 3: ...ponents 12 2 4 Information for use 13 2 4 1 Corrosion 13 3 Handling 14 3 1 Transport 14 3 2 Storage 14 3 3 Assembly information 14 3 3 1 Mounting instructions 14 3 3 2 Potential equalisation 15 3 3 3...

Страница 4: ...e operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and ad...

Страница 5: ...and or in Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The r...

Страница 6: ...on protection DIN 1988 200 Regulations for external corrosion protection DKI Informationsdruck i 160 Scope Notice Regulations applicable in Ger many Requirements for material storage DIN EN 806 4 Chap...

Страница 7: ...in potable water and gas installations Use is possible in the following areas among others n Solar installations n District heat supply systems n Low pressure steam systems n Cooling water pipelines...

Страница 8: ...y copper pipes that comply with the pertinent regulations may be used see Chapter 2 1 Standards and regulations on page 6 Copper pipes in solar installations d x s mm Volume per metre of pipe l m Pipe...

Страница 9: ...ts n Do not use pipe hooks n Observe distance to connectors n Observe the expansion direction plan fixed and gliding points Affix the pipelines in such a way as to de couple them from the installa tio...

Страница 10: ...ion co effi cient mm mK Example Length expansion with pipe lengths 20 m and T 50 K mm Copper 0 0166 16 6 Fig 2 Length expansion of copper pipes 1 Length expansion I mm 2 Pipe length l0 m 3 Temperature...

Страница 11: ...essing The sealing element is not deformed during pressing Fig 4 SC Contur Viega press connectors are equipped with the SC Contur The SC Contur is a safety technology that is certified by the DVGW and...

Страница 12: ...6 bar 0 1 MPa 1 bar Comments Short term peak temper atures 280 C 1 Consultation with the Viega Service Center required 2 3 5 Markings on components The press connectors are marked with a coloured dot...

Страница 13: ...external corrosion protection There are exceptions in the following cases n Contact with aggressive building materials such as nitrite or mate rials containing ammonium n in aggressive surroundings If...

Страница 14: ...ulations from section Storage on page 6 n Store components in a clean and dry place n Do not store the components directly on the floor n Provide at least three points of support for the storage of pi...

Страница 15: ...ied out by qualified electricians Always integrate the metallic piping system into the potential equalisation It is the fitter of the electrical system who is responsible for ensuring that the potenti...

Страница 16: ...ealing element higher thermal resistance e g for industrial use 3 3 4 Space requirements and intervals Space requirement PT1 type 2 PT2 PT3 EH PT3 AH Pressgun 4B 4E 5 d 12 15 18 22 28 35 a mm 20 20 20...

Страница 17: ...mm 30 30 30 30 30 30 b mm 70 70 70 75 80 80 c mm 40 40 40 40 40 40 Space requirement press ring d 12 15 18 22 28 35 a mm 40 40 45 45 50 55 b mm 45 50 55 60 70 75 c mm 35 35 40 40 45 50 Minimum interva...

Страница 18: ...n imum interval a mm 0 0 0 0 0 10 For the Z dimensions refer to the respective product page in the online catalogue 3 3 5 Required tools The following tools are required for production of a press conn...

Страница 19: ...g element Do not use pointed or sharp edged objects to remove the sealing element These could damage the sealing element or bead Remove the sealing element from the bead Insert a new undamaged sealing...

Страница 20: ...ns to avoid damage to pipes and sealing elements Do not use cutting discs angle grinders or flame cutters when cutting to length Do not use grease or oils e g cutting oil For information about tools a...

Страница 21: ...TICE Damage due to the wrong tool Do not use sanding disks or similar tools when deburring The pipes could be damaged by these Deburr the inside and outside of the pipe Handling Profipress S 21 from 2...

Страница 22: ...KM matt black n The sealing element is undamaged n The complete sealing element is in the bead Push the press connector onto the pipe as far as it will go Mark the insertion depth Place the press jaw...

Страница 23: ...is pressed 3 4 6 Leakage test The installer must perform a leakage test before commissioning Carry out this test on a system that is finished but not yet covered Observe the applicable regulations se...

Страница 24: ...6 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements Handling Profipress S 24 from...

Отзывы: