
Position the element on the floor rail.
If necessary, adjust the foot depth from 50 mm (pre-mounted) to 75
mm.
Pull the foot out and turn by 90°.
Screw the feet together with the support profile.
Adjust the construction height of the element in accordance with the
on-site marking of the upper edge of the finished floor.
n
X: 1000 mm
Attach the element to the support profiles using the screws sup‐
plied.
Mounting in metal support profile
d
9
Y
Y
Handling
Prevista Dry washbasin element with individually adjustable ceramic height
23 from 38