background image

Model

Year built:

4935.1

from  01/2003

en_INT

Advantix bathroom drain

Instructions for Use

Содержание Advantix 4935.1

Страница 1: ...Model Year built 4935 1 from 01 2003 en_INT Advantix bathroom drain Instructions for Use ...

Страница 2: ...Advantix bathroom drain 2 from 25 ...

Страница 3: ...on for use 8 2 3 1 Installation variations 8 2 3 2 Sealing 9 2 3 3 Fire protection 13 2 4 Required accessories 14 3 Handling 16 3 1 Assembly information 16 3 1 1 Important note 16 3 1 2 Installation dimensions 16 3 1 3 Tools and materials 16 3 2 Assembly 17 3 2 1 Connecting the drain 17 3 2 2 Prepare for subsequent work 18 3 2 3 Sealing the drain 19 3 2 4 Mounting the top 22 3 3 Maintenance 24 3 3...

Страница 4: ...triction does not extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs DANGER This symbol warns against possible life threatening i...

Страница 5: ... EN and or in Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The pertinent national laws stand ards regulations and guidelines as well as other technical guidelines have priority over German European guidelines in this manual The information is not binding for o...

Страница 6: ...head seal of 30 mm do not fulfil the provisions of EN 1253 1 Check if the drainage capacity is sufficient before mounting 2 1 2 Media The drain is intended to be in constant operation for the channelling off of typical household wastewater in acc with DIN 1986 3 n The short term temperature of the wastewater may reach up to 95 C The temperature must be considerably lower in constant operation n Th...

Страница 7: ... the drain unit 2 2 Product description 2 2 1 Overview 1 2 3 4 7 6 5 1 grate 2 top can be cut to length 3 removable odour trap 4 flange for the application of the conventional sealing 5 horizontal drain support DN 50 with ball joint socket 6 base unit 7 inlet DN 40 for the connection of additional drain pipes e g from washbasin shower etc 2 2 2 Technical data Nominal width DN drain support 50 Nomi...

Страница 8: ...is placed in a floor recess and then cast in During the mounting on the floor the drain is integrated into the floor construction At the same time it can e g be integrated into the level ling screed or heat insulation If necessary a vertical drain pipe can be led through a drill hole in the floor at the same time Mounting in a bare concrete floor Fig 1 General installation example Floor recess Mou...

Страница 9: ...or fire protection If necessary proof of compliance with building code or an expert s report must exist 2 3 2 Sealing The drain can be sealed both conventionally as well as with bonded sealing Depending on the type of sealing you will require the relevant equip ment set Ä Chapter 2 4 Required accessories on page 14 Product information Advantix bathroom drain 9 from 25 ...

Страница 10: ...to the bare concrete or heat insulation This process has proved itself to be particularly effective for sealing balconies patios floor panels and cellar floors In addition sealing lanes are often used as an additional second sealing layer below the bonded seal The following components are required for the installation of a drain with conventional sealing n Drain n Clamping ring with sealing cuff f...

Страница 11: ...able bonded sealing must be carried out in acc with ZBD data sheet 1 2010 and in acc with the guideline for bonded sealing BS Bonded sealing can be carried out with the help of a suitable stacking element You have the possibility to double seal using conventional and bonded sealing or only using bonded sealing Fig 4 Diagram of a bonded seal Bonded sealing Product information Advantix bathroom drai...

Страница 12: ...e material change from drain to screed either a suitable sealing cuff or sealing strip which is designed for overlapping with the BS with a width of at least 50 mm must be used n The screed must be laid at a minimum incline of 1 2 n The installation must be carried out properly in acc with the installa tion manual and the manufacturer s information 1 9 8 7 6 2 3 4 5 Fig 5 Construction diagram of t...

Страница 13: ...use below ceramic tiling boded with adhesives Information regarding the procedure can be found in the instructions for use of the corresponding product 2 3 3 Fire protection Advantix shower channels and drains can both be fitted to be fire proof The R120 pipe lead in can be used for this purpose in the floor con struction In this way a fire resistance time of up to 120 minutes can be achieved Fig ...

Страница 14: ... separately see catalogue The drain can be fitted with a sieve insert model 4958 to collect dirt If a conventional sealing is to be made a suitable sealing collar and a clamping ring will be required You will find a corresponding set in the catalogue model 4948 31 Top Sieve insert Accessories for the conventional sealing Product information Advantix bathroom drain 14 from 25 ...

Страница 15: ...ix drains can be equipped with an additional odour barrier which also closes the drain odour tight if the water seal in the odour trap has evaporated Odour nuisance is even avoided with drains that are only seldom used Odour barriers can be found in the catalogue Accessories for the bonded sealing Odour barrier Product information Advantix bathroom drain 15 from 25 ...

Страница 16: ...if necessary supply the required accessories Ä Chapter 2 4 Required accessories on page 14 During assembly n observe installation dimensions n decide whether or not a backflow seal is required in the insertion part of the top After assembly n the drain flange must be fully lined with mortar 3 1 2 Installation dimensions Ø100 Ø220 165 105 75 35 Ø50 Ø40 Fig 7 Dimensional drawing model 4935 1 3 1 3 T...

Страница 17: ... n A pipe to the planned drainage position is already in place for the connection to the waste water system n The drainpipe has an internal sealing lip Push the drain support into the drainpipe completely The connection to the inlet must first be made to be able to mount the drain Proceed as follows Requirements n Inlet pipe has been mounted Unscrew the union nut from the drain inlet Connecting to...

Страница 18: ...For this reason proceed as follows to prepare the drain for subsequent work Requirements n The drain is connected n The inlet is connected Position the drain at the desired height at the place of use Depending on planning the drain can be integrated into concrete screed or a heat insulation layer for example It is important that the upper edge of the drain flange is flush with the upper edge of th...

Страница 19: ...lugs NOTICE Product damage due to improper installation If hollow spaces occur during the lining of the drain leaks may occur when pressure is applied Inform the subsequent workers that the drain must be fully lined and that there must be no hollow spaces 3 2 3 Sealing the drain NOTICE Product damage due to improper installation If hollow spaces occur during the lining of the drain leaks may occur...

Страница 20: ...ng ring The sealing ring must lie in the groove between the flange and the screw holes INFO The Viega sealing collar has two differently coated sides One side is coated with bitumen and the other with EPDM If the additional sealing takes place with bitumen lanes the sealing collar must be used with the bitumen side facing upwards If EPDM lanes are used the EPDM side must face upwards Position the ...

Страница 21: ... fixing screws of the clamping ring may only be screwed into the screw holes of the drain ð The drain is sealed and the remaining sealing lanes can be laid Requirements n The flange is free of heavy soil n The complete surface of the flange is lined with material and undam aged Remove protective foil Bonded sealing Handling Advantix bathroom drain 21 from 25 ...

Страница 22: ...rer s instructions for use Lay the sealing collar into the liquid foil Apply second layer of liquid foil onto the sealing collar and if neces sary onto the floor 3 2 4 Mounting the top The top with the grate must still be mounted to finish off the mounting of the drain Proceed as follows Handling Advantix bathroom drain 22 from 25 ...

Страница 23: ... the top but water may seep in from below Normally no backflow seal is mounted so that water that occurs around the frame e g due to a leaky silicone joint can flow away A backflow seal is mounted in the following cases In the case of the risk of a build up of water that can soak through the screed During the mounting of a stacking element for the bonded sealing see instructions for use of the sta...

Страница 24: ... stains even around the drain unit and the siphon can be removed using typical household cleaner It should be noted that the cleaning agent should be rinsed off after the prescribed soaking time There should be no residue on the components 3 3 2 Cleaning the drain We recommend using a mild cleaning agent and a washing up brush for cleaning Remove and clean grate Remove and clean immersion pipe Han...

Страница 25: ...ipe Replace grate 3 4 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements Handling Advantix bathroom drain 25 from 25 ...

Отзывы: