XX163-17-00 Rev 1208 SVFT-PRS Pressurized Dome Housing
Installation
•
13
Installing the 23-Pin Connector Assembly
(If the prefabricated 23-pin cable assembly is used)
6. Use the 23-pin cable assembly
purchased separately. It should
resemble the assembly of
Figure 7.
a. Identify the cables required
for attaching to the 23-pin
connector assembly. There
should be a minimum of
three (3), power (18 to 32
VAC), control (RS-422/485)
and video (RG-59 or
twisted pair cable). There
could be optional site
cables for alarm inputs or
the relay output (jacketed
twisted pair).
b. Verify that each cable has
had the jacket stripped
back. If not, strip back the
jacket and individual wire
covering to the dimensions
shown in Figure 8.
c. Identify each wire on the
site installed cables and
label it (A, B, C, D, etc.) in
accordance with the 23-pin
cable assembly wires.
d.
Installing the cable
assembly is complete.
Proceed to Step 8.
Note: The wire color code may not match Figure 7. Use the wire labels for absolute reference.
Figure 7
23-Pin Connector Assembly Details
On coaxial and UTP units, L, M, X and U are not used.
On fiber units L, M, J, K, X and U are not used.
On ViconNet units, A, C, D, P, T, L, M, J, K. X, and U are not used.
Содержание SVFT-PRS
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 19: ...XX163 17 00 Rev 1208 SVFT PRS Pressurized Dome Housing Installation 11 Figure 5 Pressurizing the Housing ...
Страница 27: ...XX163 17 00 Rev 1208 SVFT PRS Pressurized Dome Housing Installation 19 Figure 9 Pressurizing the Housing ...