Installation
|
2-11
Surveyor MKII HD Network Dome
5. Apply the provided anti-seize lubricant to the first 2-3 unpainted
threads of the housing.
6. Lift the housing/sunshield up to the mount and feed the cables
through its top opening.
7. Place the housing onto the 1.5-inch pipe and screw clockwise,
looking up at the housing. When it becomes snug, turn it an additional
quarter-turn.
8. If using an alternate mounting configuration that uses an external
(male) 1-1/2-in. pipe thread, a coupling adapter is required. Repeat
steps 4, 5 and 6. Apply a watertight silicone (or equivalent) sealant
after installation to avoid leakage. Refer to Alternate Mounting
Configuration figure below.
9. Remove terminal blocks from the accessory kit. The 2-pin (J2) is for
power, the 4-pin (J11) is for control/relay and the 8-pin is for alarms
(J12).
10. Slide excess cable back up into the mount/pipe so that cable length is
flush with the bottom of the housing, approximately 8 - 9 inches (203 -
229 mm).
Note
There should be minimal wire slack at all connection points.
11. Install the terminal blocks J11, J12 and J2 into the Customer
Interface Board at the proper block frames. Refer to the
Installing
the Cables
sub-section of the Wiring section and Table 2 for detailed
instructions on wiring the unit.
12. Swing the customer interface board back into place. If interface board
was completely removed, be sure to reinstall it correctly, with the
white connector near the wall of the housing. After wiring is complete,
dress cables up over board.