ViconNet Nucleus Installation and Configuration Guide
|
5
Unpacking and Inspection
All Vicon equipment is tested and inspected before leaving the factory. It is
the carrier’s responsibility to provide suitable delivery.
Inspect the cartons upon delivery and, if damage is present, make detailed
notes on the carrier’s bill. Then, obtain the carrier agent’s signature and file a
damage claim as soon as possible.
Open the cartons and inspect the equipment for damage. Save the cartons
and packing material. If damage is present, contact the carrier and file a
damage claim immediately. If the equipment must be returned for repair,
follow the
Shipping Instructions
at the end of this manual.
Unpacking the Unit
Carefully open the carton. Remove the accessory kit and the VN-NUC-
SYSTEM from the box and place them on a large, flat working surface. Open
the accessory kit and verify the contents against the list in Table 1.
Required Items for Installation
To properly install the VN-NUC-SYSTEM there must be simple hand tools
available such as a screwdriver, wrenches, pliers and wire cutters/strippers.
To setup for operation there must be a keyboard and a mouse available to
operate the GUI. These are included with the unit.