User’s operating instructions  

 

Reset key with “Chimneysweeper” mode  

 

WARNING!  
This  operation  can  be  carried  out  exclusively  by  personnel  from  authorized  After  Sales  Service 
centres.
 
 

 

The user is NOT authorized to activate the following described mode.  
 
By pressing this key the “Chimneysweeper” mode is activated. This means that the boiler will be forced 
to  operate  at  the  maximum  (or  minimum)  output  so  as  to  permit  the  adjustment  operations  and  the 
combustion analysis.  

 

 

By  pressing  this  key  for  at  least  3  seconds  the  boiler  will  operate  at  the  maximum  output  (led  D  = 
illuminated and flashing and led E = constantly illuminated).  

 

 

By briefly pressing this key again (<3 secs.), the boiler will operate at the minimum output (both the 
leds D and E flashing). 

 

 

By briefly pressing this key again (<3 secs.), the boiler will operate at the minimum output (both the 
leds D and E flashing). 

 

 
The “chimneysweeper” mode will remain enabled for 15 minutes. To disenable the “CHIMNEYSWEEPER” mode before 
this set time has elapsed, press the reset/chimneysweeper key “G” for at least 3 seconds.

 

System temperature control/pressure gauge  

 

This displays:  

 

on the upper scale the central heating hot water flow temperature is indicated.  

 

On the lower scale the water pressure in the central heating system is indicated.  

 

If the pressure is lower then 0,7 bar, then it will be necessary to restore the correct pressure by 
operating the filling valve when the system is cold and the boiler not operating 

 

 

6.2 

CHECK LIST BEFORE COMMISSIONING THE BOILER  

 
Before commissioning the appliance it is recommended to check the following points:  

 

Check that the On-Off gas valve, positioned upstream of the boiler, is in the On position.  

 

Check that any On-Off valves fitted on the flow and return pipes for servicing purposes are in the On position.  

 

Check that any On-Off valves fitted on the cold water inlet for servicing purposes are in the On position.  

 

Check that the pressure relief valve drainage pipe is connected to the sewage system.  

 

Check that the boiler is connected to the electrical supply; the green indicator led (

) on the control panel must be 

illuminated.  

 

Check the heating system pressure, indicated by the pressure gauge. For correct operation the pressure should be 
between 0,8 and 1 bar (with the pump not running). If the pressure falls below 0,7 bar restore the correct pressure 
by regulating the filling valve when the system is cold and the boiler not operating (refer to paragraph 6.5). 

 

 

Содержание ViaKON 24 B

Страница 1: ...17 2013 ...

Страница 2: ...pliance or other objects The appliance is designed to be used in pumped hot water central heating systems and for domestic hot water production Any other use of this appliance will be considered improper VIADRUS declines any responsibility for any damages or injuries caused by an improper use in this case the risk is completely at the user s responsibility In order to use the appliance according t...

Страница 3: ...s animals or damage to property The manufacturer shall not be held liable for any such injury and or damage 5 SAFETY WARNINGS WARNING The installation adjustment and servicing of this appliance must be carried out by a competent person and installed in accordance with the current standards and regulations Failure to correctly install this appliance could cause injury to persons animals or damage t...

Страница 4: ...ressure gauge Summer winter selector Central heating temperature control knob By turning this knob it is possible to choose the following operating modes Summer only DHW production Winter DHW production and central heating temperature control When the switch is in the Summer position the central heating mode is excluded However the frost protection mode remains enabled With the knob in the positio...

Страница 5: ...nk Power On indicator led This led will illuminate when the boiler is connected to the electricity supply Central heating mode indicator led This led will illuminate when there is a request for central heating If simultaneously there is a request for domestic hot water production the led will switch off Burner On indicator led When this led is illuminated it indicates that the burner is functionin...

Страница 6: ...per scale the central heating hot water flow temperature is indicated On the lower scale the water pressure in the central heating system is indicated If the pressure is lower then 0 7 bar then it will be necessary to restore the correct pressure by operating the filling valve when the system is cold and the boiler not operating 6 2 CHECK LIST BEFORE COMMISSIONING THE BOILER Before commissioning t...

Страница 7: ...inter in position 1 corresponds to the minimum temperature of 35 C the knob pointer in position 1 corresponds to the maximum temperature of 80 C SWITCH OFF OF THE BOILER Deactivation of heating mode By rotating the knob B completely to the left the heating is deactivated but the D H W mode remains active Summer mode Complete boiler shut down If the boiler is completely shut down the CH and DHW mod...

Страница 8: ... metal systems Do not use anti frost products for motor vehicles because they could seriously damage the water gaskets If for any reason there is no gas or electrical supply the above described frost protection mode will not be active 6 5 ELIMINATING THE FAULTS If the boiler goes into lock out the user can reset the boiler only in the following cases Lock out led illuminated and flashing Cause Ins...

Страница 9: ...ck is in the On position and that the air present in the piping has been vented Press the reset key to restore correct boiler operation If the cut off device operates repeatedly a maximum of 3 times causing boiler shutdown do not try to relight the boiler your self Contact your nearest VIADRUS authorized After Sales Service Centre WARNING If the boiler goes into lock out and or the leds continue t...

Страница 10: ...ng factory The manufacturer requires for the guarantee applicability In the meaning of the Act No 222 94 Coll On conditions for business activities and government administration execution in certified branches and on Government Energy Inspection and ČSN 38 6405 amendment 1 5 99 EN 1775 to perform periodically 1 x year a gas boiler inspection Inspections may only be performed by an authorized organ...

Страница 11: ...kaging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure that calorific gain is achievable for the functional packaging unit EN 13431 YES Iron NO 3 3 Recovery by composting ensure compost ability in all terms of the standard for the functional packaging unit ...

Страница 12: ...ors of transcript or press Also reserves the right to bring those changes that will hold necessary to it own products or profits without jeopardizing its essential characteristics VIADRUS a s Bezručova 300 735 81 Bohumín Tel 420 596 083 050 Fax 420 596 082 822 www viadrus cz info viadrus cz ...

Отзывы: