background image

 

7

3.2 

Regulating and security elements 

The smoky flap of the smoky chimney – pot regulates the climb of the product of consumption from the boiler to the chimney. It is regulated with 
the handle with a rod in the upper left part of the boiler next to the stoker hole. 
Stifling  of  the  ash  door  regulates  the  inflow  of  the  combustion  air  under  the  grate  of  the  boiler.  It  is  regulated  by  the  draught  governor  or 
manually with an adjusting screw of the stifling.  
The air rose of the stoker door serves for carrying the secondary air to the burning space. To control the rose it is necessary with respect to the 
higher surface temperature of the stoker door to use an instrument that is part of the delivered tools.  
The cleaning cover of the smoky chimney – pot located in its bottom part serves for cleaning the embedded waste product caused by burning. 
There are barriers of the smoky channel between the front and medium sections above the stoker hole of the boiler VIADRUS U 22 C. It serves 
for  reducing  the  draw  –  away  cross  -  section  and  for  a  better  utilization  of  the  product  of  consumption  at  the  boilers  of  smaller  power  (2  –  5 
sectional). They are used with a various cross – section width according to the sizes of the boilers in conformity with this tab.: 
 
Tab. 

. 7 

Barriers of the smoky channel of the VIADRUS U 22 C boiler 

Boiler section number 

(pieces) 

Cross – section of the smoky channel width (mm) 

Barrier number (pieces) 

12 

24 

36 

48 

A thermomanometer in the control box serves as an associated device for measuring the temperature of the heat water and water pressure in 
the heat system. The sump of the thermomanometer sensor is located in the upper part of the back boiler section. 
 
 

Placing and installation  

4.1 

Regulations and instructions 

The  boiler  for  solid  fuels  can  be  installed  by  a  company  with  a  valid  authorization  to  perform  its  installation  and  maintenance.  For 
installation a project in accordance with valid regulations must be executed.  
The heating system must be filled with water, that meets the 

Č

SN 07 7401 requirements, especially its harness must not exceed the 

required parameters.  

Tab. 

. 8 

 

Recommended values  

Hardness 

mmol/l 

Ca

2+

 

mmol/l 

0,3 

Concentration of total Fe + Mn 

mg/l 

(0,3)* 

*) recommended value  

 

WARNING!!! The use of anti-freeze mixture is not recommended by the manufacturer.  

a) to the heating system  

Č

SN 06 0310 

Heating systems in buildings – Designing and installation  

Č

SN 06 0830 

Heating systems in buildings – protecting device 

CSN 07 0240 

Warm water and low-pressure steam boilers. Basic regulations 

CSN 07 0245 

Warm  water  and  low-pressure  steam  boilers.  Warm  water  boilers  with  output  up  to  50  kW.  Technical 
requirements. Testing. 

Č

SN 07 7401 

Water and steam for thermal energy equipments with working pressure up to 8 MPa. 

b) to the chimney 

Č

SN 73 4201 

Chimneys and flue gas ducting– designing, implementation and connection of fuel consumers. 

c) regarding the fire regulations  

Č

SN 06 1008 

Fire safety of heat installations. 

EN 13501-1+A1 

Fire  classification  of  construction  products  and  building  elements  –  Part  1:  Classification  using  test  data  from 
reaction to fire tests 

d) to the system of HWS heating  

Č

SN 06 0320 

Heating systems in buildings – Hot water preparation – Designing and planning 

Č

SN 06 0830 

Heating systems in buildings – Safety devices. 

Č

SN 75 5409  

Water installations inside buildings.  

 

4.2 

Placing possibilities 

Boiler positioning in the living space (including corridors) is prohibited! 
A continuous air supply for burning and eventual ventilation must be ensured for the room where the boiler is installed.  
The installation of the boiler must comply with all requirements of 

Č

SN 06 1008. 

Boiler placing with regard to fire regulations: 

1. 

Placing on floor of flame resistant material (Pic.4) 

-

 

boiler to be put on a flame resistant backing exceeding the boiler platform over 20 mm at sides and only on the boiler drum depth. 

-

 

if the boiler is situated in a cellar we recommend to place it on a bedding of minimum 50 mm height. 

2. 

Safety distance from the flammable materials 

-

 

when installing and operating the boiler it is necessary to keep a safety distance of 200 mm from the materials of combustibility grade 
A1, A2, B and C (D);  

-

 

for easily combustible materials of combustibility grade E (F), which quickly burn and burn themselves even after removal of ignition 
source (such as paper, cardboard, asphalt and tar paper, wood and wood-fiber boards, plastics, floor coverings) the safe distance has 
to be doubled, i.e. to 400 mm;  

-

 

safe distance should be doubled as bulb where the grade of reaction to fire has not been proved. 

Содержание U 22 D

Страница 1: ...VIADRUS U 22 C D Manual for boiler operation and installation GB_2015_24 GB_2017_14 ...

Страница 2: ...Boiler drum installation 10 5 3 2 Jacket assembly 10 5 3 3 Filling of the heat system with water 11 6 Putting into operation instructions for a contractual service organization 12 6 1 Control operation before starting 12 6 2 Putting the boiler into operation 12 6 3 Boiler transformation from solid fuels to gas and liquid fuels and retroactively 12 7 User s boiler service 12 7 1 Heating up 13 7 2 O...

Страница 3: ... cast iron exchanger and all other parts with respect to the quality of used materials 2 Design approved in the long term 3 Elaborate production technology on automatic forming lines with consistent and approved quality of the production process ISO 9001 ISO 14 001 4 Efficiency of coke and anthracite burning 75 80 efficiency of wood burning 75 5 Simple service and maintenance 6 Low demandingness f...

Страница 4: ...tuated at the back part of the boiler The back section of the boiler has a smoky chimney pot and a heat water flange in the upper part and a returnable water flange with a socket for impregnating and clearing plug Stoker and ash door and a firebox door under them are fixed to the front section The whole boiler drum is isolated with a stifling mineral isolation that reduces losses by sharing heat i...

Страница 5: ...er Cleaning cover of the chimney pot Back part of the jacket with isolation Flange of the returnable water with a socket Elbow clearing plug Firebox door Medium section Ashtray Control handle of the smoky flap Thermomanometer Draught governor Upper part of the jacket with isolation Stoker door Stoker door closure Air rose Ash door Ash door closure Stifling Hanging pin Adjusting screw of the stifli...

Страница 6: ...screw of the stifling Front section Boiler insertion Back section Three figure sump Flange of the heat water Smoky chimney pot Flat socket of the smoky chimney pot Smoky flap Lever Cleaning cover of the chimney pot Back part of the jacket with isolation Flange of the returnable water with a socket Elbow clearing plug Firebox door Medium section Ashtray Control handle of the smoky flap Medium secti...

Страница 7: ... Concentration of total Fe Mn mg l 0 3 recommended value WARNING The use of anti freeze mixture is not recommended by the manufacturer a to the heating system ČSN 06 0310 Heating systems in buildings Designing and installation ČSN 06 0830 Heating systems in buildings protecting device CSN 07 0240 Warm water and low pressure steam boilers Basic regulations CSN 07 0245 Warm water and low pressure st...

Страница 8: ...e materials polyurethane polystyrene polyethylene PVC The boiler placing with respect to the necessary handling space basic surroundings of AA5 AB5 according to ČSN 33 2000 1 ed 2 handling space of minimum 1000 mm in front of the boiler must be maintained a minimum distance of 400 mm between the back part of the boiler and the wall to maintain space for access to the back part of the boiler of min...

Страница 9: ...s 3 x 26 1 piece split pin 2 5 x 32 1 piece washer 10 5 3 pieces bushings HEYCO 2 pieces blind flanges 6 pieces screws into metal C 4 8 x 13 4 pieces flange of heat water DN 50 1 piece flange of returnable water DN 50 with a socket Js 1 2 for impregnating and clearing plug 1 piece well of thermostat 1 piece sealing φ 90 x 60 x 3 2 pieces operating key 1 piece hook 2 pieces socket 8 mm 2 pieces boi...

Страница 10: ...the well of thermostat into the hole in the top part of the rear section Fig 7 6 To put the stove pipe to the smoky chimney pot and penetrate it into the chimney hole 7 To screw the draught controller to the hole in the upper part of the front section 8 Two holes with a Js 6 4 thread in the front section to blind with Js 6 4 closures Fig 8 The boiler connecting dimensions 5 3 2 Jacket assembly 1 T...

Страница 11: ...01 can be used for fill up The heat system is needed to be rinsed so as all impurities have been washed out During heat period it is necessary to keep consistent water volume in the heat system While filling up of the heat system with water it is necessary to prevent the air from leeching onto the system The water from boiler and heat system must never be impregnated or taken out for use except fo...

Страница 12: ...CITE The optimal fuel is coke with granularity of 40 60 mm but it is possible to burn even coke and anthracite with granularity of 20 40 mm nut 2 In case of sufficient chimney draught 0 15 to 0 25 mbar it is possible to burn even non caking anthracite with granularity of 30 50 mm nut 1 and 50 80 mm cobbles WOOD Guarantee of clean and good combustion is to use only dry and wood in the natural state...

Страница 13: ...n smaller quantity than during typical burning Coal will burn slower and with less intensiveness temperature will increase slower but it is a normal phenomenon As soon as a burning layer arises white smoke begins to decrease 10 As soon as the fuel passes to dark red glow it is necessary to close the throttle valve by about 1 2 mm and close the rosette of the stocking door 11 From this time you can...

Страница 14: ... eventually coke when setting the boiler to the maximum operating temperature 9 IMPORTANT NOTICE 1 The boiler VIADRUS U 22 is not intended for the Czech market 2 The boiler only can be used for the purpose that it is destined for 3 The boiler must be operated only by adults who are introduced to these operating instructions It is unallowable to let children at the boiler unattended of adults Inter...

Страница 15: ...er a consumer Mainly it is necessary to specify when and by whom the boiler was commissioned as well as it is necessary to specify a precise address of operation of the boiler VIADRUS a s provides the extended guarantee period for the boiler drum during 60 months from the sell by date but not longer than 66 months from the dispatch date of the product from the production plant The condition for re...

Страница 16: ...70 and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 75 Energy efficiency index EEI 74 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 11 7 kW At rated heat output ƞn 75 3 At 30 50 of rated heat output if applicabl...

Страница 17: ...ssil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 75 Energy efficiency index EEI 74 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 17 7 kW At rated heat output ƞn 77 2 At 30 50 of rated heat output if applicable Pp kW A...

Страница 18: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 62 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 20 kW At rated heat output ƞn 63 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 19: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 64 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 25 kW At rated heat output ƞn 65 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 20: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 66 Energy efficiency index EEI 95 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 30 kW At rated heat output ƞn 67 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 21: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 68 Energy efficiency index EEI 98 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 35 kW At rated heat output ƞn 69 7 At 30 50 of rated heat output if applicable Pp kW A...

Страница 22: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 65 Energy efficiency index EEI 94 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 40 kW At rated heat output ƞn 66 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 23: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 62 Energy efficiency index EEI 89 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 45 kW At rated heat output ƞn 63 5 At 30 50 of rated heat output if applicable Pp kW A...

Страница 24: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 64 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 49 kW At rated heat output ƞn 65 5 At 30 50 of rated heat output if applicable Pp kW A...

Страница 25: ...kaging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure that calorific gain is achievable for the functional packaging unit EN 13431 YES Iron NO 3 3 Recovery by composting ensure compost ability in all terms of the standard for the functional packaging unit ...

Страница 26: ...26 ...

Страница 27: ... card for customer user Recording of performed warranty and after warranty repairs and performance of regular product check Recording date Performed operation Contractual service organization signature stamp Customer s signature ...

Страница 28: ...VIADRUS U 22 C D VIADRUS a s Bezručova 300 E mail CZ 735 81 Bohumín info viadrus cz www viadrus cz ...

Отзывы: